Laserfiche WebLink
parallel to I-694 within Mn/DOT R/W would require an exemption to Mn/DOT's policy. <br />Maintenance access manholes should be located outside of Mn/DOT R/W. There was <br />some discussion of improved technology for pipe repair from inside the pipe. The pipe <br />alignment should. include a crossing of I-694 within the `unweave' project limits to <br />eliminate high pipe jacking costs. Mn/DOT will consider the feasibility of revising the <br />project limits if required by the pipe alignment identified during. engineering. Running <br />the pipe along Country Drive, outside of Mn/DOT R/W should be considered. <br />6. Cost-sharing for the project was discussed. The County and St. Paul Regional Water <br />will commit to the cost of engineering services. The discussion of benefited partners will <br />continue as construction costs are identified. <br />Notes by Terry Noonan <br />\projects\W. Vadnais 2 <br />