Laserfiche WebLink
Item Description: Strategic Lake Management Plan -Lake Owasso <br />Page3 <br />At .that meeting in July the GLWMO Board .authorized the purchase of monitoring equipment so that <br />water sampling could begin yet in the fall of 2006. The attached proposed work scope and cost estimate <br />from Barr Engineering addresses the stated goals and concerns executed by the GLWMO Board <br />members. The proposed GLWMO budget for 2007 includes an allowance for the cost of the preparation <br />of the study, including staff and lab costs attributed to water sampling and/or monitoring. <br />Recommended Board Action: <br />The Board should review the proposed work scopelprogram from Barr Engineering and consider <br />authorizatiomof the Study.. <br />