My WebLink
|
Help
|
About
|
Sign Out
Home
2006-10-26_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Grass Lake WMO
>
Agendas and Packets
>
200x
>
2006
>
2006-10-26_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2010 11:59:14 AM
Creation date
4/16/2010 11:37:18 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Grass Lake WMO
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
10/26/2006
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item Description: Strategic Lake Management Plan -Lake Owasso <br />Page3 <br />At .that meeting in July the GLWMO Board .authorized the purchase of monitoring equipment so that <br />water sampling could begin yet in the fall of 2006. The attached proposed work scope and cost estimate <br />from Barr Engineering addresses the stated goals and concerns executed by the GLWMO Board <br />members. The proposed GLWMO budget for 2007 includes an allowance for the cost of the preparation <br />of the study, including staff and lab costs attributed to water sampling and/or monitoring. <br />Recommended Board Action: <br />The Board should review the proposed work scopelprogram from Barr Engineering and consider <br />authorizatiomof the Study.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.