Laserfiche WebLink
rate and/or volume reduction), availability of land for BMP implementation, and soil characteristics <br />at potential BMP sites. It is expected that macrophyte management may play a role in the <br />recommendations for this lake. If this is the case, Barr will include general aquatic macrophyte <br />management recommendations as part of the BMP analysis. <br />Once the BMPs have been analyzed, planning-level cost estimates will be prepared to help determine <br />the cost effectiveness of identified BMPs. Individual BMPs will be prioritized based on overall cost- <br />effectiveness, and a phased implementation plan will be developed. <br />Prepare a Management Alternatives Report on the Lake Owasso Diagnostic- <br />Feasibility Study, with Stakeholder Involvement <br />Expected Cost: $16,870 <br />Creating a Management Alternatives Report on the Lake Owasso Diagnostic-Feasibility Study will <br />involve generating drafts that describe the work conducted through the UAA process, the UAA <br />results, maps, discussion of management alternatives and concept-level recommendations of remedial <br />measures for the lake. After incorporating the WMO's feedback on the initial draft report, it will be <br />presented at a public meeting in order to obtain feedback. A revised final report will then be <br />generated for presentation at a subsequent public meeting. <br />Project Management <br />Expected Cost: $5,160 <br />Project management consists of administrative activities associated with the project, including Barr- <br />GLWMO correspondence; communications between Barr, RCPW, and RWMWD technical staffs; <br />project team meetings; invoicing; laboratory coordination; etc. <br />Overall Project Schedule <br />Barris available to begin work on this project immediately upon authorization by the WMO. We <br />will complete this project as quickly as possible, and plan to be substantially done by the end of <br />2007. <br />Barr Engineering Company <br />ODMA\PCDOCS\DOCS\2477250 <br />