Minnesota
<br />DEPARTMENT OF
<br />NATURAL RESOURCES
<br />1
<br />Permit Number
<br />2001-6111
<br />Pursuant to Minnesota Statutes, Chapter 103G, and on the basis of statements and information contained in the
<br />permit application, letters, maps, and plans submitted by the applicant and other supporting data, all of which are made a part
<br />hereof by reference, PERMISSION IS HEREBY GRANTED to the applicant to perform the work as authorized below:
<br />Public Water County
<br />All within Ramsey County Ramsey (62)
<br />Name of Permittee Telephone Number (Include Area Code)
<br />Ramsey Conservation District Attn: Tom Petersen 651-266-7272
<br />Address (No. & Street, RFD, Box No., City, State, Zip Code)
<br />1425 Paul Kirkwold Drive, Arden Hills, Minnesota 55112
<br />AUthoriZed Work:
<br />Stabilize shorelines and streambanks using bioengineering, including: bank resloping, breakwater
<br />installation, fiber roll toe protection, plant carpets, fiber mats, willow wattles, willow posts, brush layering,
<br />brush mattressing, vegetated soil lifts, tree revetments, hard toe protection, bendway weirs, rock vanes
<br />and other flow diverters; all in accordance with the Conditions of this permit.
<br />Purpose of Permit: Expiration Date of Permit
<br />Bank/Shoreline Stabilization November 30, 2011
<br />Pr4nerty D~gcribed Ash
<br />Various, within Ramsey County
<br />_ I
<br />This permit is granted subject to the following CONDITIONS:
<br />The permittee is not released from any rules, regulations, requirements, or standards of any applicable federal, state, or
<br />local agencies; including, but not limited to, the U.S. Army Corps of Engineers, Board of Water and Soil Resources, MN
<br />Pollution Control Agency, watershed districts, water management organizations, county, city and township zoning. This
<br />permit does not release the permittee of any permit requirement of the St. Paul district, U.S. Army Corps of Engineers, Army
<br />Corps of Engineers Centre, 190 Fifth Street East, St. Paul, MN 55101-1638.
<br />2. This permit is not assignable by the permittee except with the written consent of the Commissioner of Natural Resources.
<br />3. The permittee shall notify the Area Hydrologist at least five days in advance of the commencement of the work authorized
<br />hereunder and notify him/her of its completion within five days. The Notice of Permit issued by the Commissioner shall be
<br />kept securely posted in a conspicuous place at the site of operations.
<br />4. The permittee shall make no changes, without written permission previously obtained from the Commissioner of Natural
<br />Resources, in the dimensions, capacity or location of any items of work authorized hereunder.
<br />5. The permittee shall grant access to the site at all reasonable times during and after construction to authorized
<br />representatives of the Commissioner of Natural Resources for inspection of the work authorized hereunder.
<br />This permit may be terminated by the Commissioner of Natural Resources at any time deemed necessary for the
<br />conservation of water resources of the state, or in the interest of public health and welfare, or for violation of any of the
<br />conditions or applicable laws, unless otherwise provided in the permit.
<br />7. Construction work authorized under this permit shall be completed on or before the date specified above. The permittee
<br />may request an extension of the time to complete the project, stating the reason thereof, upon wriften request to the
<br />Commissioner of Natural Resources.
<br />
|