Laserfiche WebLink
Minnesota RECEIVED FES 2 8 2007 <br />Permit Number <br />2007-0356 <br />DEPARTMENT OF <br />NATURAL RESOURCES <br />Pursuant to Minnesota Statutes, Chapter 103G, and on the basis of statements and information contained in the <br />permit application, letters, maps, and plans submitted by the applicant and other supporting data, all of which are made a part <br />hereof by reference, PERMISSION IS HEREBY GRANTED to the applicant to perform the work as authorized below: <br />Public Water <br />Lake Wabasso (62-82P) <br />Name of Permittee <br />Ramsey County Public Works Attn: Terry Noonan <br />Address (No. & Street, RFD, Box No., City, State, Zip Code) <br />1425 Paul Kirkwold Drive, Arden Hills, Minnesota 55112 <br />County <br />Ramsey (62) <br />Telephone Number (Include Area <br />651-266-7160 <br />Authorized Woric: <br />Excavate approximately 50 cubic yards of accumulated material within a 1,725 square foot area <br />extending 60-feet waterward of the shoreline to a depth of 36-inches to facilitate launching of watercraft; <br />all as shown and described in the permit application and supporting materials received January 22, <br />2007, and the Conditions of this permit. <br />Purpose of Permit: Expiration Date of Permit <br />Boat Ramp Excavation November 30, 2007 <br />Property Described As: <br />SEY4 of Section 36, T30N, R23W <br />UTM Zone 15; Eastin 490931 Northing 4987801 <br />This permit is granted subject to the following CONDITIONS: <br />1. The permittee is not released from any rules, regulations, requirements,. or standards of any applicable federal, state, or <br />local agencies; including, but not limited to, the U.S. Army Corps of Engineers, Board of Water and Soil Resources,. MN <br />Pollution Control Agency; watershed districts, water management organizations, county, city and township zoning. This <br />permit does not release the permittee of any permit requirement of the St. Paul district, U.S. Army Corps of Engineers, Army <br />Corps of Engineers Centre, 190 Fifth Street East, St. Paul, MN 55101-1638. <br />2. This permit is not assignable by the permittee except with the written consent of the Commissioner of Natural Resources.. <br />3. The permittee shall notify the Area Hydrologist at least five days in advance of the commencement of the work authorized <br />hereunder and notify him/her of its completion within five days. The Notice of Permit issued by the Commissioner shall be <br />kept securely posted in a conspicuous place at the site of operations. <br />~. The permittee shall make no changes, without written permission previously obtained from the Commissioner of Natural <br />Resources, in the dimensions, capacity or location of any items of work authorized hereunder. <br />~. The permittee shall grant access to the site at all reasonable times during and after construction to authorized <br />representatives of the Commissioner of Natural Resources for inspection of the work authorized hereunder. <br />~. This permit may be terminated by the Commissioner of Natural Resources at any time deemed necessary for the <br />conservation of water resources of the state, or in the interest of public health and welfare, or for violation of any of the <br />conditions or applicable laws, unless otherwise provided in the permit. <br />Construction work authorized under this permit shall be completed on or before the date specified above. The permittee <br />may request an extension of the time to complete the project, stating the reason thereof, upon written request to the <br />Commissioner of Natural Resources. <br />