My WebLink
|
Help
|
About
|
Sign Out
Home
2009-07-23_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Grass Lake WMO
>
Agendas and Packets
>
200x
>
2009
>
2009-07-23_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2010 3:56:32 PM
Creation date
4/16/2010 3:49:24 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Grass Lake WMO
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
7/23/2009
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal -Sampling Monitoring Wells-Woodbridge Neighborhood Porous Pavement, Shoreview <br />RCD's current in-kind involvement: <br />Thus far, the RCD has already contributed the following in-kind services to the project.: <br /> Approximate Cost (RCD <br />Task In-kind Services <br />Planning session with the City and the MDH for placement; $150 <br />installation, and sam lin of wells <br />Site visit with the Ci to select exact well locations $75 <br />Two days of well installation su ervision $1,200 <br />Site visit to measure the depth to groundwater in the four $75 <br />wells/ iezometers <br />Sampling and Analysis Plan stipulating sampling frequency, X150 <br />rocedures, and chemical analyses <br />TOTAL: $1,650 <br />Ramsey Conservation District, Minnesota Department of Health, and Ramsey County- <br />EnvironmentaI Services have offered to contribute in-kind services to this project. The MDH <br />will be contributing laboratory analytical. services as well as use of their submersible pumps for <br />the sampling. Ramsey County-Environmental Services will contribute the RCD's use of a water <br />quality testing field instrument during sampling events (4 events, approximate in-kind value <br />$150/event, total $b00}. This proposal covers RCD's further project participation. <br />RCD's proposed future tasks: <br />The next steps will involve th.e following: <br />1. rivo sampling events prior to porous pavement installation, <br />2. two semi-annual (twice a year) sampling events after pavement installation, <br />3. installation of two Troll pressure transducers in wells to monitor groundwater elevation, <br />4, installation of an automated rain gauge and data logger in the neighborhood to record <br />precipitation, and <br />organization of data in an annual report to the City. <br />x:\groundwater\shoreview\woodbridge-Ik Owasso-moult wells-pictures\praposal-grass lake wmo-Woodbridge mw sampfing.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.