Laserfiche WebLink
Project Overview <br />Sites 26 <br />Raingarden 12 <br />Shoreline 10 <br />Other 4 <br />GLWMO Time Breakdown <br /> Admin- CS <br />Ryan 4.25 <br />Sarah 0 <br />Paul 0 <br />Shawn 0 <br />Plans Completed 23 <br />Raingarden 9 <br />Shoreline 10 <br />Other 4 <br />Prep (set up) On Site Design Total (hrs) <br />13.50 19.00 47.75 89 <br />0 0 45.5 45.5 <br />0 0 5 5 <br />0 5* 0 5 <br /> 144.5 <br />*Presentation for Water Smart Landscaping <br />Installed Projects (during 2009 Season) <br />Raingarden Shoreline <br /># Installed 1 # Installed 0 <br />sf 350 If 0 <br />Treated Area (sf) 8,500 sf 0 <br />Volume Reduction (gal) 4,718 Project Cost $ 0 <br />Project Cost $ 3,500.00 GLWMO CS $ 0 <br />GLWMO CS $ 600.00 RCD CS $ 0 <br />RCD CS $ 600.00 TSS to be tallied starting 2010 season <br />TP to be tallied starting 2010 season <br />Encumbered Projects <br />Type # GLWMO CS RCD CS <br />Raingarden 3 $ 1,800.00 $ 600.00 <br />Shoreline 1 $ 1,000.00 $ 6,225.00 <br />4 $ 2,800.00 $ 6,825.00 <br />ActivityReport-G LW MO_2009 <br />