Laserfiche WebLink
<br />Project Update: <br />The contractor completed all of the watermain work <br />last December. Clean up and restoration remains <br />for this spring. <br />We have been fortunate to have an early spring this <br />year. However, temperatures are still dropping <br />below freezing at night. Final restoration of <br />disturbed areas will occur once the overnight <br />temperatures are warmer and the ground has <br />completely thawed. Sod is anticipated to be placed <br />in late April or early May. The contractor is <br />required by contract to complete restoration by <br />June 1, 2010. Restoration includes the following: <br /> <br /> <br /> <br /> <br /> <br />Any excess mounds of dirt or settled areas will <br />be re-compacted and re-graded prior to <br />placement of sod. <br />Fencing: If a section of your fence was removed <br />for access purposes, it will be permanently <br />reinstalled this spring. <br />The shut-off valves, or curb boxes, that were <br />located in your backyards on your old service <br />line, were cut off at ground level when the old <br />service was disconnected, and new curb boxes <br />have been installed in the boulevard behind the <br />curb. These will be lowered to be flush with the <br />ground. <br />The green material that has been sprayed on <br />mounds of dirt and on exposed soils in the <br />boulevards throughout the neighborhood is <br />called hydro-seed, and is a slurry mixture of <br />seed (turf grass), fertilizer, and a green dye. <br />This was applied as an erosion control <br />measure. These areas will be re-graded and <br />restored. <br />Other landscaping: We will work with each <br />property owner to restore any other landscaping <br />features that may have been disturbed during <br />construction. <br />Please contact Dean Findell, Project Coordinator, <br />at dean.fiindell aC~.ci.roseville.mn.us or 651-792-7046, <br />if you have any questions about the work to be <br />done in your yards. We will work with you to <br />ensure that you are satisfied with the restoration on <br />your property. <br />Thank you! <br />We realize the inconvenience construction projects <br />cause to property owners, especially with <br />disruptions to water service, and construction crews <br />working both in your front and back yards. We <br />sincerely appreciate your patience throughout the <br />course of this project. We feel that this was a <br />successful project that will result in fewer <br />inconveniences to you in the future as our <br />customer. The likelihood of water main breaks will <br />be reduced now that the new water main pipe is in <br />place, and City crews will be able to access the <br />water main for future maintenance without <br />disturbing your backyards. <br />Please let us know if you have any questions or <br />concerns about the project. <br />C~uestions? Please Contact us: <br />ESristine Giga, P.E., Civil Engineer (651) 792-7048 <br />®ean FindelB, Project Coordinator (651) 792-7046 <br />Check for construction updates at: www.cityofroseville.com/projects. <br />