What will the new street look like? <br />The standard design for residential streets is 32 <br />feet wide with an asphalt surface. A six inch (6") <br />high, straight-face concrete curb and gutter is <br />installed at the same time. <br />How long will the work take? <br />Construction usually takes about 5 months. <br />Contractors are required to keep the road passable <br />and provide driveway access whenever possible. If <br />you have special access needs, let us know as <br />soon as possible. <br />What will happen to my driveway and sod? <br />The new street will be constructed to match the <br />elevation of existing driveways as closely as <br />possible. It will be necessary, however, to replace <br />the end of your driveway to ensure a smooth <br />transition to the street. This replacement will be in <br />gravel, asphalt or concrete depending on what <br />material existed prior to construction. <br />Similarly, in order to match the new curb and gutter <br />to your yard, sod will be replaced adjacent to the <br />street. There is no additional charge for these <br />replacements. <br />Can I have my driveway replaced? <br />As long as your proposed changes conform to the <br />City's driveway code, additions or changes to your <br />driveway can be made with the street project. <br />These include: <br />• Widening your driveway. <br />• Replacing/ changing existing driveway pavement. <br />You must, however, pay any additional costs for <br />extra work prior to the work starting. Additional <br />information regarding this option will be provided if <br />the project is approved. <br />Can I have my sanitary sewer service replaced? <br />The maintenance of your sewer service from the <br />sewer main to the building is your responsibility. If <br />you have a history of back-ups or have to clean <br />your service frequently, it may be to your <br />advantage to get an estimate to replace your <br />service under the street as a part of the project. <br />Additional information regarding this option will be <br />provided if the project is approved. <br />Will mail delivery be disrupted? <br />The contractor will work closely with the post office <br />to ensure uninterrupted mail delivery. Mail boxes <br />will be grouped together at a nearby corner. <br />Following construction, your mailbox will be <br />replaced as close as possible to its original location <br />or a location specified by you. <br />What about my sprinkler system? <br />Removal of underground sprinkler systems in the <br />boulevard is the property owner's responsibility. <br />Utility Flags <br />To protect against underground utility damage, the <br />City will be calling in utility locates later this <br />summer. This is required by anyone digging a <br />hole, whether it is for planting a tree or <br />reconstructing a road. Xcel Energy, Comcast and <br />Qwest will locate their underground utilities by <br />spray painting and placing flags in the boulevard. <br />The City needs this information for project design. <br />TYPICAL RECONSTRUCTION SCHEDULE <br />2-3 d Mailboxes are removed and temporary <br />mailboxes installed at a neighborhood <br />central location <br />2-4 wk Xcel replaces gas mains prior to city <br />contractor starting work <br />1 wk Contractor removes the existing street <br />(street access limited to through traffic <br />+ only. Some contractors remove street <br />after sewer repair -see next item) <br />2 wk Watermain replacement <br />2 wk Sanitary sewer main and property owner <br />sewer line repairs done, if needed <br />2 wk Storm sewer construction and/or <br />modifications <br />1 wk Gravel base is installed <br />1 wk Concrete curbs built (entry into driveways <br />not possible for 5 days -you will be able <br />to park in the street adjacent to your <br />property) <br />1 wk Concrete/Bituminous driveways are <br />poured (concrete driveways not useable <br />for 5 days; bituminous 1-2 hours) <br />1 wk First layer of asphalt placed on street <br />(street access near normal) <br />1 wk Manhole castings set back in place <br />1 wk Boulevards sodded <br />1 wk Final layer of asphalt placed <br />2-3 d Mailboxes reinstalled <br />Dale Street Reconstruction June 10, 2010 Page 2 <br />