Laserfiche WebLink
City of Roseville 2010 Fee Schedule <br />Suilding Permit Fee — Engineerin� <br />� . . . � � � ' ��� •� � � <br />$1-$500 $- $5 <br />$501 - $2,000 - 5 <br />$2,001 - $25,000 - 25 <br />$25,001 - $50,000 - 50 <br />$50,001 - $100.000 - 75 <br />$100,001 - $500,000 - 100 <br />$500,0001 - $1,000,000 - 200 <br />In excess of $1,000,000 - 300 <br />Demolition Permit Fee: <br />Electrical Permit Fee: <br />Set through yearly contract with Contract Electrical Inspector <br />Fire Safetv Inspection Fee: <br />An amount equal to eight percent (8%) of the amount determined by the Suilding Permit Fee <br />(except for single-family dwellings) to be charged and used to defray the cost of fire safety <br />inspections (Ord. 1237, 3-13-2000, eff. 5-1-2000) <br />Grading Plan Review Fee — Planning & Zonin� <br />�• � � ' � ' ��� •� ' � <br />50 cubic ards or less $0 $75 <br />$100.00 for the first 1,000 cubic $150.00 for the first 1,000 <br />51 — 10,000 cubic yards yards, plus $30.00 for each cubic yards, plus $30.00 for <br />additional 1,000 yards or each additiona11,000 yards or <br />fraction thereof fraction thereof <br />$400.00 for the first 10,000 $400.00 for the first 10,000 <br />10,001 — 100,000 cubic yards cubic yards, plus $20.00 for cubic yards, plus $20.00 for <br />each additional 10,000 yards or each additional 10,000 yards or <br />fraction thereof fraction thereof <br />$600.00 for the first 100,000 $800.00 for the first 100,000 <br />In excess of 100,000 cubic yards cubic yards, plus $10.00 for cubic yards, plus $10.00 for <br />each additional 10,000 yards or each additiona110,000 yards <br />fraction thereof or fraction thereof <br />ri <br />