My WebLink
|
Help
|
About
|
Sign Out
Home
2009_1116_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2009
>
2009_1116_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2012 3:27:44 PM
Creation date
8/9/2010 4:37:32 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Roseville 2010 Fee Schedule <br />Grading Plan Review Fee — Engineerin� <br />Grading Permit Fee — Planning & Zonin� <br />�• � � ' � ' ��� •� ' � <br />50 cubic ards or less $0 $75 <br />$100.00 for the first 100 cubic $100.00 for the first 100 cubic <br />1— 1,000 cubic yards yards, plus $20.00 for each yards, plus $20.00 for each <br />additional 100 yards or fraction additional 100 yards or fraction <br />thereof thereof <br />1,001 — 10,000 cubic yards $280.00 for the first 1,000 cubic $300.00 for the first 1,000 <br />yards, plus $20.00 for each cubic yards, plus $30.00 for <br />additional 1,000 yards or each additiona11,000 yards or <br />fraction thereof fraction thereof <br />$460.00 for the first 10,000 $600.00 for the first 10,000 <br />10,001 — 100,000 cubic yards cubic yards, plus $80.00 for cubic yards, plus $100.00 for <br />each additional 10,000 yards or each additiona110,000 yards <br />fraction thereof or fraction thereof <br />In excess of 100,000 cubic yards $1,135.00 for the first 100,000 $1,500.00 for the first 100,000 <br />cubic yards, plus $80.00 for cubic yards, plus $100.00 for <br />each additional 10,000 yards or each additiona110,000 yards <br />fraction thereof or fraction thereof <br />Grading Permit Fee — Engineerin� <br />Investigation Fee: Work without a Permit <br />Whenever any work for which a permit is required from the city has been commenced without <br />first obtaining said permit, a special investigation shall be made before a permit may be issued for <br />such work. An investigation fee, in addition to the permit fee, shall be collected whether or not a <br />permit is then or subsequently issued. The investigation fee shall be equal to the amount of the <br />permit fee required by this code. The payment of such investigation fee shall not exempt any <br />person from compliance with all other provisions of this code nor from any penalty prescribed by <br />law. <br />E:j <br />
The URL can be used to link to this page
Your browser does not support the video tag.