Laserfiche WebLink
City of Roseville 2010 Fee Schedule <br />Manufactured Home Permit Fee: <br />New installation � $ 188 � $ 250 <br />Mechanical Permit Fee - Residential: <br />�• � � ' � ' ��� •� ' � <br />Air conditionin — new $ 43.00 $ 43.00 <br />Air conditionin — re lacement 55.00 55.00 <br />Warm air furnace — new 91.00 91.00 <br />Warm air furnace - re lacement 55.00 55.00 <br />Hot water boilers — new 91.00 91.00 <br />Hot water boilers — re lacement 55.00 55.00 <br />Unit heaters 55.00 55.00 <br />Swimmin ool heaters 55.00 55.00 <br />Misc. work & as i in 1.25% of 'ob cost 1.25% of 'ob cost <br />Minimum fee 55.00 55.00 <br />Gas fire lace 55.00 55.00 <br />In floor heat $ - $55.00 <br />Mechanical Permit Fee - Commercial: <br />All commercial work <br />Moving Permit Fee: <br />1.25% of iob cost I 1.25% of iob cost <br />Plumbin� Permit Fee: <br />�7 <br />