My WebLink
|
Help
|
About
|
Sign Out
Home
2010-07-27_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2010
>
2010-07-27_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2010 3:28:45 PM
Creation date
8/19/2010 3:14:32 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
7/27/2010
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~, <br />Project Update <br />The first layer of bituminous is paved on the <br />majority of the streets in Area 1 of this project. The <br />Contractor, Astech, will be starting the pavement <br />rehabilitation work next week for Areas 2 & 3. <br />What follows is a schedule of when work should <br />occur on the streets in this project. Please be <br />aware that these schedules are weather <br />dependent, rain can cause delays. Check the <br />website for the most current information. <br />Week of June 28: <br />• Restoration behind the curb for streets paved in <br />Area 1. <br />Additional utility work on Farrington Ave (S <br />Owasso Blvd. to Millwood Ave). <br />Paving first lift on Farrington and Millwood St <br />(Vl/estern Ave to Farrington Ave) <br />Reclaim bituminous on Area 2 streets. <br />Week of July 5th: <br />• Storm structure rehabilitation in Area 1. <br />• Concrete curb removal and replacement begins <br />for Areas 2 & 3. <br />Week of July 12th: <br />• Curb replacement continues for Areas 2 & 3. <br />• Grade base on Area 2 streets. <br />• Restoration behind the curb on Area 3 streets. <br />• Mill bituminous on Area 3 streets. <br />Week of July 19: <br />• Raise manholes and gate valves and pave Area <br />3 streets. <br />• Pave first lift of bituminous on Area 2 streets. <br />Week of July 26: <br />• Restoration behind the curb on Area 2 streets. <br />• Raise manholes and gate valves Area 2 streets. <br />August: <br />• Restoration of Area 2. <br />• Pave second lift of bituminous in Area 2. <br />• Pave Area 3 streets. <br />It is anticipated that the work for this project will be <br />completed by Mid-August. <br />200 Contract B <br />Street Maintenance <br />For purposes of describing progress on this <br />project we have broken the road segments into <br />Areas, as follows: <br />Area 1: <br />• Farrington Cir (Transit Ave to Cul-de-sac) <br />• Farrington Ave (S Owasso Blvd. to Millwood Ave) <br />• Kent St {Iona Lane to Woadhill Dr) <br />• Mackubin St (Iona Lane to W. County Road C) <br />• Millwood St (Western Ave to Farrington Ave) <br />• Virginia Cir (Transit Ave to Cul-de-sac) <br />• Woodhill Dr (Kent St to Western Ave} <br />Area 2: <br />• Brenner Ave (Cleveland Ave to Evelyn St) <br />• Brenner Court (Old Highway $ to Cul-de-sac) <br />• County Raad C2 (Cleveland Ave to Cul- de- sac} <br />• Evelyn St (W. County Road D to Brenner Ave) <br />• Laurie Rd {Fernwood Ave to Lexington Ave <br />• Mount Ridge Rd {W. Co Rd D to Brenner Ave) <br />• Sandhurst Dr (Fernwood Ave to Lexington Ave <br />• Sherren St (Fernwood Ave to Lexington Ave <br />Area 3: <br />• Cleveland! TH36 Svc Dr (W. Co Rd B2 to W. <br />Perimeter Dr) <br />• County Road C2 (Lincoln Ave to Snelling) <br />• Lincoln Dr (Lydia Ave to Terrace Dr) <br />Check for construction updates at: www.cityofroseville.com/2010ContractB <br />
The URL can be used to link to this page
Your browser does not support the video tag.