Laserfiche WebLink
project(s), such as Veritas, and provide the framework for a more practical mixed <br />used business park. <br />3.0 STAFF COMMENT and RECOMMENDATIONS <br />3.1 As outlined above, the detailed renewal strategy process is well under way. Once <br />the Council decides on a scenario(s), a more detailed AUAR review can begin, <br />culminating in final approval of changes to the Comprehensive Plan. The Council <br />needs to accept or reject the Commissions recommended scenario which will <br />provided "direction and define the scope" for further study. Should the detailed <br />AUAR study of the selected scenario uncover some significant new <br />environmental, physical, or fiscal impacts, the Plan and the scenarios would be <br />brought back to the Commission and Council for further modifications. <br />3.2 To begin the AUAR review process staff will work more closely with Planning <br />Consultant, DSU to develop a work plan and cost estimate for the project based <br />upon the recommended land uses. In addition, there will be a need to hire a <br />traffic consultant to evaluate the estimated traffic capacity of recommended <br />redevelopment plan. There is an opportunity to partner with the I-3 SW <br />Coalition's traffic consultant, SRF, in this effort as they look at the traffic impact <br />all along the entire corridor based upon the build out study. <br />3.3 Staff will return to Council with a request to approve a work plan and costs <br />associated with the development and review of the AUAR by DSU and traffic <br />study by SRF in late January. <br />3.4 The staff prepared both visual and technical reports necessary to evaluate the <br />impact to the community of the 270 acre redevelopment master plan, including 46 <br />parcels. The technical plan amendment describes the possible redevelopment of <br />between 2.1 and 3.5 million square feet of building area depending on the height <br />of the structures and the traffic and utility capacities. <br />3.5 Focus group meetings have been held. A staff summary the findings is attached. <br />3.6 An AUAR approach to environmental review is recommended over more <br />parcel specific approaches such as an EAW or EIS for several reasons: <br />1. It requires the technical rigor of an EIS, the most rigorous form of review, but <br />uses the convenient "worksheet" format of an EAW. <br />2. Unlike an EIS or EAW, an AUAR requires mitigation of the project's <br />environmental impacts. <br />3. An AUAR addresses impacts of future development, as well as of the <br />proposed project. <br />4. As a result, future proj ects in an AUAR study area may not require further <br />detailed environmental review, if they are consistent with original AUAR <br />assumptions, their impacts do not exceed those anticipated by the AUAR and <br />mitigation measures are implemented, as required by the AUAR. <br />PF3232 — RCA(010801) Page 3 of 6 <br />