My WebLink
|
Help
|
About
|
Sign Out
Home
2001_0409_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2001
>
2001_0409_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2014 2:46:16 PM
Creation date
10/25/2010 1:37:06 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contractor Chain Link Fence Recommendation <br />American Fence $8,736 Accept <br />Century Fence $9,091 X <br />D'Fence Co. $9,884 X <br />Hanson Bros. $13,880 X <br />KellerFence $14,450 X <br />Contractor <br />ALL BIDS <br />Contractor <br />ALL BIDS <br />Brick Structure with Arbor <br />Ornamental Fence <br />Recommendation <br />Reject <br />Recommendation <br />Reject <br />The recommended bids include the construction of approximately 1!2 mile of asphalt trails, the <br />construction of one ballfield, 1 soccer field, 1 full court basketball court, all removals, site <br />amenities, excavation and grading for the project. The recommendation is to reject the irrigation <br />system and to redesign and rebid this item. We are also recommending the rejection of the <br />masonry and pre-cast stone bids because there was only one bidder and the bids were over <br />budget. These items will be combined and new quotes requested for these items. Additionally <br />separate bids (quotations) are being planned for the play equipment, aglime and minor electrical <br />work. We are also recommending the rejection of alternates for the brick structure and arbor near <br />the play equipment site and the ornamental fencing neat the play site because they are outside <br />the budget parameters. <br />The construction of the park is scheduled to begin May 1. <br />POLICY OBJECTIVE <br />The proposal to accept bids for the first phase construction of Lexington Park is consistent with the <br />followingpolicies: <br />♦ Parks and Recreation Commission Recommendations <br />♦ Parks and Recreation Systems Plan <br />♦ Lexington Park Master Plan <br />♦ Parks and Recreation Infrastructure Committee Recommendations <br />♦ Council Authorizations <br />♦ State bidding statutes <br />FINANCIAL IMPLICATION <br />This project total is $294,025 and is within the total project budget of $562,000 for all items planned. <br />The City monies for the proposed development would be taken from the Parks and Recreation Park <br />Improvement Fund and would be combined with the $50,000 grant from Ramsey County for soccer <br />fields and approximately $12,000 from the Cornerstone Grant. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.