My WebLink
|
Help
|
About
|
Sign Out
Home
2001_0723_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2001
>
2001_0723_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2014 12:45:49 PM
Creation date
10/25/2010 1:38:00 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
these meetings. We are working with them on their level of commitment. Their cost split is <br />based on contributing runoff. What follows is the breakdown of participation: <br />City of Roseville <br />Dept. of CFL/Wellington <br />Mn/DOT <br />Universitv of Minnesota <br />City of Falcon Heights <br />Total <br />Estimated <br />Percent Cost <br />87.11% $522,650 <br />2.35% $ 14,100 <br />6.09% $ 36,550 <br />2.18% $ 13.100 <br />2.27% $ 13 600 <br />$600,000 <br />The City's portion of the cost would be financed using our Storm water utility fund. This fund <br />was set up to finance storm water system maintenance and improvements. We would work on <br />agreements with each of the agencies in conjunction with the preparation of plans and <br />specifications. Each agreement would be brought before the Council prior to approval of final <br />plans and specifications at the September 10 meeting. <br />Policy objectives: The City has taken a more active role in correcting regional drainage <br />problems. Much of our City was developed prior to the drafting of our current storm water <br />treatment and retention policies. As a result there are areas that need improvements. We will <br />be addressing these on a case by case basis. <br />Schedule: We have put together a schedule for this project. <br />City Council Accept Feasibility Study & Authorize Preparation of Plans July 23, 200 1 <br />and Specifications <br />Plan/Specification Preparation, Mn/DOT review and August-September, 200 1 <br />Cost share a reements a rovals <br />City Council Approve Plans and Specifications and Authorize September 10, 200 1 <br />Advertisement for Bids <br />Receive BidsM~� �___. � October 16, 2001 <br />Award Contract October 22, 200 1 <br />Substantial Com letion of Work March 15, 2002 <br />REC01�I1�IENDED COUNCIL ACTION: <br />Authorize the preparation of plans and specifications for the Zimmerman Lake Drainage <br />Improvement. <br />Prepared by: Debra Bloom <br />
The URL can be used to link to this page
Your browser does not support the video tag.