My WebLink
|
Help
|
About
|
Sign Out
Home
2001_1022_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2001
>
2001_1022_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2014 2:24:08 PM
Creation date
10/25/2010 1:38:55 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Centre Pointe Planned Unit Development Stages of Approval <br />Woodbridge PUD 647 0000 s.f. <br />Woodbridge -Built 120,000 s.£ 120,000 s.f. 120,000 s.£ 120,000 s.f. <br />Ryan PUD 619,000 s.£ 619,000 s.f. 619,000 s.£ 619,000 s.f. <br />Adm. Amendment 10%) 61.900 s.f. 61.000 s.£ 61.900 s.f. <br />CSM Hotel PUD Amend. 3`° Busi�ess Hot�1 <br />(no signif. s.f. added) <br />Veritas Exn.PUD Amend 122.000 s.f. <br />Solutia Amendment 15,240 s.f. <br />A roved PUD 647 000 s.f. 739 000 s.£ 800 300 s.f. 802 500 s.£ 938 140 s.f. <br />1.4 The original Centre Pointe Master Site Plan for the vacant parcel showed a 6,000 square <br />foot building footprint for a restaurant. The new proposal would add 4,620 square feet to <br />the first floor footprint and a 10,620 square feet second floor. Therefore, new office <br />building coverage of the parcel totaling 15,240 square feet would occur. <br />1. S To reduce parking lot coverage of the parcel and a11ow for 25% landscaped area, Solutia <br />Consulting proposes a parking structure to be built under the building for 30+ vehicles. <br />As proposed, construction would occur in 2002. <br />1.6 The text for the PUD indicates that the first choice of a permitted use is a sit-down <br />restaurant and that a second choice of a permitted use is an office building. Specifically <br />Section 72 reads: The uses shall be restricted to those specified in the site plan and <br />supporting documents including office, office/showroom, office/manufacturing 2 hotels, <br />and 1 restaurant within the Centre Pointe Business Park Plan. If either of the hotels or <br />the restaurant are not built, the lots/sites for those uses on the approved land use/site <br />plans sha11 be used for office, office/showroom, or office/manufacturing uses per Exhibit <br />E-2. <br />1.7 The major change for the Master Site Plan (a drawing) is changing the identified use <br />from restaurant to office and adding appro�mately 4,000 square feet of "footprint" on <br />the 6,000 square foot building pad. <br />1.8 The major change for the PUD Agreement (written ordinance) is increasing the building <br />dimensions for that particular lot. <br />PF 3338 — RCA (10J22/O1) — Page 2 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.