Laserfiche WebLink
REQUEST FOR COUNCII, ACTION <br />DATE: 12/ 1 1/O 1 <br />ITEM NO.: �-2 <br />Dep me Approval: 1�Tanager Reviewed: Agenda Section: <br />� `� +��?.�' CohSen f <br />Item Description: Final contract acceptance for City Project M-00-20: Cleveland Avenue <br />Storm Sewer Improvements <br />Background: The Cleveland Avenue Storm Sewer Improvement Project includes installation of <br />875 feet of RCP pipe and associated storm sewer structures along the east side of Cleveland <br />Avenue from Twin Lakes Regional Pond to Wilson Pond. The project also includes site <br />restoration to the project area and bituminous patching and curb and gutter repair where the pipe <br />crosses County Road C2. <br />The contract for this work was awarded to F.M Frattalone Excavating on November 13, 2000. <br />Most of the work was completed late fa11 of 2000, final punch list items were recently completed <br />and the contractor has requested final payment. <br />Policy objectives: City policy requires that the following items be completed to finalize a <br />construction contract: <br />• Certification from the City Engineer verifying that all of the work has been completed in <br />accordance with plans and specifications. <br />. A resolution by the City Council accepting the contract and beginning the one-year warranty. <br />Financial implications: This contract has been funded through the Storm Utility Fund. The <br />final contract amount, $77,966.99 is $9,966.99 greater than the awarded amount of $68,000.00. <br />This represents an overrun of appro�mately 14.6%. The overrun is due to additional bituminous <br />and concrete paving. The e�sting storm pipe, which we connected to, was shallower than <br />indicated on record drawings. This required the installation of concrete aprons on the driveways <br />to structurally protect the new pipe from the semi truck traffic passing over it. Even with the <br />overrun, we are within the budgeted project amount of $80,000. <br />Staff recommendation: All necessary items have been completed in accordance with proj ect <br />plans and specifications. Since a11 items ha�e been completed as outlined in the policy regarding <br />final contract acceptance, staff recommends the City Council approve a resolution accepting the <br />work completed as the Cleveland Avenue Storm Sewer Improvement Project and authorize final <br />payment of $22,867.74. The total amount paid for this contract is $77,966.99. <br />