My WebLink
|
Help
|
About
|
Sign Out
Home
2002_0304_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2002
>
2002_0304_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2014 10:44:55 AM
Creation date
10/25/2010 1:46:02 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
245
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8.0 SITE DEVELOPMENT REQUIREMENTS <br />To ensure that the proposed development meets the CITY'S requirements and standards for site <br />development, the following provisions shall apply: <br />8.1 Final Grading Plan. The final grading plan for each property and/or site must be <br />reviewed and approved by the Director of Public Works before any permits will be <br />issues. All grading shall comply with the approved grading plans and shall be the <br />responsibility of the DEVELOPER. The DEVELOPER's engineer shall provide to the <br />CITY a letter certifying that the grading project was constructed and was completed as <br />depicted in the approved grading plan prior to the issuance of a Certificate of <br />Occupancy (Exhibit �. <br />8.2 Final Utility Servicing Plan. The final utility servicing plan for each property and/or <br />site must be reviewed and approved by the Director of Public Works prior to any <br />permits being issued for the building (Exhibit �. <br />8.3 Erosion Control. Prior to site grading, and before any utility construction is <br />commenced or building permits are issued, an erosion control plan must be submitted <br />for approval by the Director of Public Works and/or the Gras Lake Watershed, and all <br />erosion control actions shall be implemented, inspected and approved by the CITY <br />(Exhibit �. <br />8.4 Clean Up. Each DEVELOPER shall clean dirt and debris from streets that has resulted <br />from construction work by said DEVELOPERS, its agents or assigns. The CITY will <br />determine whether it is necessary to take additional measures to clean dirt and debris <br />from the streets. After 24 hours verbal notice to the developer, the CITY may complete <br />or contract to complete the clean up at the DEVELOPER'S expense. <br />8.5 Pedestrian Walkways. The DEVELOPER of Lot 1 Accessible Space Addition must <br />construct a concrete sidewalk five feet wide within the Lexington Avenue right-of-way <br />from the northwestern most corner to the southwestern most comer of said lot. Each <br />DEVELOPER is responsible for replacement of any damage to the e�sting pedestrian <br />path located along Roselawn Avenue adjacent to the northern property line of each lot. <br />8.6 S�^eet Right-of- Way Dedication. The <br />8.7 Utility 8z Drainage Easements. <br />8.8 Park Dedication. <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.