Laserfiche WebLink
. 2. Front footage Basis . � <br />Determine the total assessable front footage of al 1 lots and <br />equivalent lot units receiving lateral benefit and divide the <br />proj ect cost by the total of assessable front footage. Each <br />lot Or equivalent lot unit assessment is equal to the total <br />assessable front footage per unit multiplied by the front <br />footage assessment rate. <br />C) Municipal State-Aid Construction Fund Contributions <br />When a Municipal State-Aid Street project includes either trunk or <br />lateral storm sewer, which the Minnesota Department of <br />Transportation determines may be funded by Municipal State-Aid <br />construction funds, the amount determined to be actually funded by <br />• M nDOT may be deducted from the total improvement costs to be <br />` assessed. <br />d) Infrastructure Reconstruction Proj ects <br />Any proj ect or portion of a project which reconstructs an existing <br />storm sewer system facility. A reconstruction project may occur <br />in the existing alignment of the storm sewer pipe or on a new <br />�• alignment thus, allowing the existing line to be abandoned or its <br />" status downgraded (i.e., trunk to lateral). <br />• <br />27 <br />