Laserfiche WebLink
A p r 0 1 0 2 09: 22a City of Mapleuood <br />PAVEMENT MANAGEMENT POLICY <br />651 748 3089 <br />CITY OF MAPLEWOOD <br />Financing: Unit assessment <br />Commercial/industrial, including higher-density residential: <br />Considered individually for each project <br />Residential unit: $3000 street, $600 storm <br />City contributes balance from general fund, state aid funds, <br />etc. <br />3. Eteclamation and Overlay (14ca1 Streets� <br />Includes: Recycling existing pavement as aggregate base <br />Minor grading of roadway <br />Overlay street with bituminous surfacing <br />Minor storm sewer and drainage improvements <br />Rainwater gardens with plantings <br />Financing: Unit assessment <br />Commercial/industrial, including higher-density residential: <br />Considered individually for each project <br />Residential unit: $3800 street, $600 storm <br />City contributes balance from general fund, etc. <br />� : �� �� �. - ;-. _ -u-� <br />Includes: Remove some or all existing pavement <br />Minor base and subgrade repair <br />Repair or replace concrete curb and gutter <br />Install new bituminous pavement <br />Financing: Unit assessment <br />Commercial/industrial, including higher-density residential: <br />Considered individually for each project <br />Residential unit: $2100 • <br />City contributes balance from general fund, state aid funds, <br />etc. <br />5. flQjiland Overlay <br />Includes: Milling pavement on outer edges <br />Repair or replace concrete curb and gutter <br />Resurface existing bituminous pavement <br />Page 2 <br />p.4 <br />., .. <br />