Laserfiche WebLink
The Countv Road C Streetscape Framework Manual <br />Worksession Discussion Summarv <br />� :�:.:�.::....:;::......... . }' <br />i).U'✓3,;: �..•3�iL"�s'iJ: �`�f'f3:�:� <br />�' �*,�_';: <br />.. fi>�> <br />e ' .x • <br />7-1 Design Principles/ Elements The Council expressed concern about the elements of the <br />should be functional. ... streetscape being "functional". This was included in the <br />tnanual_ <br />7-1 Design Principles/ The The Council was concerned about maintenance costs. <br />streetscape elements should We are looking at using prefab elements, instead of the <br />be cost effective.. . custom items constructed on Larpenteur Avenue. <br />7-2 They should be placed This last sentence of the last paragraph was added to <br />outside. .. reflect the concerns brought up by the Council regarding <br />sight lines. We added it in a few other nlaces as well. <br />7-7 Plant materials These sections discuss the choices of inedian treatments <br />Medians and their success based on the level of City maintenance <br />commitment. Also the need to select plant materials <br />based on their ability to survive severe urban conditions. <br />The manner and species of plantings will be brought to <br />the Council for comment by the Citizen Tasl�orce during <br />the design portion of the construction project. <br />7- 7 Decorative paving should.. . The Council expressed concern about using pavers vs <br />stained and impressioned concrete. The e�ibit on this <br />page shows both as an option, however it would be <br />Public Works' choice to go with concrete, primarily <br />because of ease of maintenance. <br />8-1 Funding Sources/ Ramsey This section provides a discussion of a11 potential <br />County estimated.. . funding sources for the project. These can be mixed and <br />matched, using a11 options or just one or two. The <br />Framework manual is a planning document that discusses <br />alternatives. Estimated costs and funding elements will <br />be brought forward through the final design process. <br />This starts with the Feasibilitv Renort. <br />8-3 County Road C Estimated The long-term maintenance of the streetscape was <br />Maintenance Costs/ When brought up by the Tasl�orce and Council as a key part of <br />making an investment.. . the project. This section presents 4 different funding <br />strategies including the estimated maintenance costs for <br />the streetscape. This would be addressed through the <br />final desi nrocess. <br />