My WebLink
|
Help
|
About
|
Sign Out
Home
2002_0930_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2002
>
2002_0930_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2014 2:52:34 PM
Creation date
10/25/2010 1:48:50 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOW THEREFORE BE IT RESOLVED that the City Council of the City of <br />Roseville will continue to: <br />l. Adopt transit supportive and mixed use center design concepts as a means to <br />guide growth in Roseville and the I-35W Corridor, <br />2. Emphasize that the Roseville Comprehensive Plan includes mixed use <br />options, <br />3. Use overlay or PUD redevelopment zones as an implementation strategy, <br />4. Incorporate changes in roadway networks to support mixed use development <br />and walkable neighborhoods, <br />S. Develop and implement transit service strategies needed to support Roseville <br />and the Coalition's growth scenario, and, <br />6. Integrate lifecycle housing options into City planning activities. <br />BE IT FURTHER RESOLVED that the City Council encourages all <br />Roseville commissions and committees to include the Build Out Study and its <br />recommendations as an integral part of future planning efforts for the community, <br />where possible and practical in making and implementing of local decisions. <br />The motion for the adoption of the foregoing resolution was duly seconded by <br />Council Member , and upon vote being taken thereon, the following <br />voted in favor thereof: <br />and the following voted against the same: <br />WHEREUPON said resolution was declared duly passed and adopted. <br />\\Victoria\CommDev�North Metro I-35W Corridor CoalirionlI-35W Build Out Resolution (093002).doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.