My WebLink
|
Help
|
About
|
Sign Out
Home
res_6586
Roseville
>
City Council
>
City Council Resolutions
>
06xxx
>
6500
>
res_6586
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 9:10:09 AM
Creation date
4/25/2005 11:54:47 AM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Resolutions
Resolution #
6586
Resolution Title
Ordering the construction of Improvement No. P-ST-SS-77-19, Alternate 2, under and pursuant to Minnesota Statutes, Chapter 429
Resolution Date Passed
11/29/1977
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~d., ~j-fb <br /> <br />Extract of ~Unutes of Heeting <br />of City Council <br />City of Roseville <br />Ramsey County, Hinnesota <br />November 29, 1977 <br /> <br />Pursuant to due call and notice tllereof, a special meeting <br /> <br />of the City Council of the City of Roseville, f1innesota, was <br />held in the City Hall in said City on Tuesday, November 29, <br />1977, at 7~30 o'clock p.m. <br /> <br />The following members were present: Mayor Demos and <br /> <br />Councilmen Hess, Curley, and Grauel; and the following were <br /> <br />absent~ Councilman Anderson. <br /> <br />Also present were ar. James Andre, City Hanager; Robert <br /> <br />Bell, City Attorney, Charles Honchell, City Public Norks <br /> <br />Director; and Peter S. Popovich, City Bond Consultant. <br /> <br />r1AYOR DEHOS~ The meeting will corne to order. <br /> <br />. 0 000 <br /> <br />r'~YOR DEHOS~ The first improvement is P-ST-SS-77-l9. <br />Aglen from Rosela~m to Roma. <br /> <br />HR. ANDRE: I have the Certificate of rl/ailing and the <br />affidavit of publication for Aolen Street improvement. <br /> <br />HAYOR DEHOS ~ Hr. Honchell. <br /> <br />NR. HONCHELL ~ This improvement ,.,as petitioned for by 46% <br />of the affected property o,'mers and runs from the area of <br />Rosela~m southerly to Roma. The pro?osal is for the improve- <br />ment of the roadway by the construction of concrete curb and <br />gutter indicated in green on the map, which would be on both <br />sides of the roadway, and a 7-ton bituminous 9avement. This <br />would be a typical pavement design - 32 feet wide from face of <br />curb to face of curb. The existing facilities are approximately <br />30 feet wide of asphalt nm', so that would have an average <br />effect of about one foot wider on each side going toward your <br />homes, or into the boulevard area. The project, in addition <br />to the construction of the roa&",ay facilities, would call for <br />the inclusion of a pair of catch basins approximately three <br />lots south of Rosela,m, and then a small storm water pipe out <br />
The URL can be used to link to this page
Your browser does not support the video tag.