My WebLink
|
Help
|
About
|
Sign Out
Home
res_6587
Roseville
>
City Council
>
City Council Resolutions
>
06xxx
>
6500
>
res_6587
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 9:10:10 AM
Creation date
4/25/2005 11:54:50 AM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Resolutions
Resolution #
6587
Resolution Title
Ordering the construction of Improvement No. P-77-20 under and pursuant to Minnesota Statutes, Chapter 429
Resolution Date Passed
11/29/1977
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />and right now my lawn is the same level as the street and <br />people aren't always sure which is which. <br /> <br />MR. HONCHELL: The reason for not doing that is we did <br />not want to get into the next roadway until the final eleva- <br />tion of that intersection met your elevations on your readway. <br />We have not done a design on Chatsworth, and we don't want to <br />lower that intersection and go back a hundred and 50 feet each <br />way making sure it comes together because that's quite an ex- <br />pense, and I agree you may get some benefit, but your neigh- <br />bors may not want to pay for that. <br /> <br />MR. EUGENE CONNORS, l003 Ryan Avenue: I would like to <br />pose a couple of questions. The first one being, there is <br />that pile of dirt there that has to be removed to bring the <br />edge of the lot down to the street level. The estimated <br />cost that I figure that you have shown is $3200. When Ed <br />Bossard built the area he had to do the east side of Oxford <br />and get that up to the temporary level. I feel that whoever <br />owns that lot should have to incur that $3200 expense of <br />getting that down to street level. <br /> <br />MR. HONCHEI.Lt l.et me look hack -t:o t.;ho QPP1:opriate al- <br />ternative here and see if I can give you some information. <br />The entire excavation is only $2900. <br /> <br />MR. CONNORS: It says $2400 on the paper I looked at, <br />and removing trees was $800, so I came up with $3200. <br /> <br />MR. HONCHELL: Some of the trees - part of that is in the - <br />maybe I better go up here - <br /> <br />MR. CONNORS: Some of it is on the next lot which belongs <br />to Mr. Mooney. <br /> <br />MR. HONCHELL: You recall the roadway is widened out <br />here, and this pile of dirt is going to have to be moved by <br />the property owner. We are not proposing to do that and <br />assign it as an assessment. This portion of dirt that still <br />comes along in this area, if we would put the road into the <br />center, we would then be into the pile of dirt. That - a <br />portion of moving some of that dirt is into the estimate <br />
The URL can be used to link to this page
Your browser does not support the video tag.