Laserfiche WebLink
The provision of a parking plan with anchor and general mall floor plans to allow <br />the City Planner to verify the required number of parking spaces, including park <br />and ride spaces, and transit riders per the City Code. <br />The provision of a letter from Metro Transit endorsing the proposed location of <br />the transit hub, the location of the bus staging area and location of the park-n-ride <br />lot and consideration of a condition in the PUD that requires the Mall to provide a <br />location for a Regional Transit Hub at the Mall, subject only to Metro Transit's <br />wishes to retain a hub at the Ma1L (The Transit Hub is part of the City's <br />comprehensive plan concepts for traffic management and disbursement in <br />Roseville.) <br />Review and approval of the traffic study and proposed access improvements by <br />the Ramsey County Traffic Engineer, MnDOT, the city, and Metro Transit. <br />Completion (City, County, Rosedale) of the wark necessaryto create a safe, <br />accessible, clearly marked and signed pathway system on the south side of County <br />Road B2 and through the parking/trafiic movement areas that will improve <br />pedestrian access to the mall, life style center, and theater. <br />Access to the theater must be provided from both parking lots. This will require <br />a direct pedestrian access from the lower level (west) parking lot. <br />The Public Works Department must complete the review and approve of the <br />grading, drainage, sidewalk and trail, and utility plans proposed with the General <br />Concept and Final Plan submittal. All plans, including the location of fire <br />hydrants (per Fire Marshal) and utility services connections, require the approval <br />of the Public Works Department. In addition, the applicant is required to receive <br />the approval of the storm water management plan by the Rice Creek Watershed, <br />prior to the Final Planned Unit Development Plan approval by the City Council. <br />g. The provision of a lighting plan for the all revised parking lots and the building, <br />which plan must meet the requirements of Section 1010.12. <br />]i. The provision of a revised landscape plan that incorporates additional plantings in <br />all newly created curb islands and within the area surrounding the storm <br />management pond. <br />The provision of a snow removal plan that eliminates any of the parking areas <br />adjacent to the addition, specifically the theater, from temporary or permanent <br />snow storage. (The Mall has proposed a snow melting operation as an alternative.) <br />The provision of a signage plan for both building fa�ade signage and any proposed <br />monument/pylon signs. The sign plan should account for all exterior signage <br />existing and proposed at Rosedale Center. <br />PF3608_RCA_GeneralConcept_122004 Page 16 of 20 <br />