Laserfiche WebLink
<br />Open House Summary <br />St. Paul Regional Water Services <br />Demolition of the 30,000,000 Gallon Concrete Reservoir <br />Located in Reservoir Woods <br />The Open House was held on Tuesday, July 6, 2009 from 6:00 p.m. to <br />8:00 p.m. at the SPRWS offices at 1900 Rice Street. The Attendance List <br />is attached. Also in attendance representing SPRWS were: <br /> Tim Bagstad, SPRWS <br /> Doug Klamerus, SEH <br />There was only one member of the public that attended the open house. This is likely due to the <br />previous open house in December discussing the project. Several items were discussed with the <br />resident including the following: <br />Noise generated by the crushing equipment. <br /> While there will be a more consistent background <br />noise due to the consistent operation of the crusher, crushing equipment will likely not be of <br />higher decibels than the demolition process. <br />Dust emissions from the crushing equipment. <br /> The contract specifications require the use of spray <br />type dust abatement devices on the crushing equipment. <br />Reason for Recycling <br />. The decision to crush the concrete on-site will eliminate the need for 600- <br />900 trips for hauling the materials to a demolition landfill. In addition, if the material were not <br />crushed on site, additional vehicle trips would be required to haul in base material for the <br />construction of the new tank. <br />s:\pt\s\stpwu\109688\1-genl\16-meet\open house summary 070610.docx <br /> <br />