Laserfiche WebLink
the work. Construction Cost does not include the cost of providing <br /> the power supply to the service pole or pad. A Preliminary SCHEDULE <br /> "I" is attached and incorporated into this Agreement . The <br /> Preliminary SCHEDULE "I" includes all County and City Construction <br /> Costs, and is based on engineer' s estimated unit prices and <br /> State-furnished materials lump sum amounts . The County and City will <br /> participate in the following construction at the percentage <br /> indicated: <br /> a. Traffic Control Signal on Trunk Highway No. 36 at <br /> County State Aid Highway No. 50 (Hamline Avenue) /Commerce <br /> Street/City Service Road. <br /> County share is 50 Percent . <br /> City share is 37 . 50 Percent . <br /> b. EVP System on Trunk Highway No. 36 at County State Aid <br /> Highway No. 50 (Hamline Avenue) /Commerce Street/City <br /> Service Road <br /> City share is 87 . 50 Percent . <br /> c . The County and City will pay a Construction <br /> Engineering charge in an amount equal to 8 percent of the <br /> total County and City Construction Cost, respectively, <br /> covered under this Agreement . <br /> 5 . The County' s and the City' s estimated total Construction Cost <br /> share, Lump Sum State-furnished Materials and Construction <br /> Engineering costs are $122 , 580 . 00 for the County and $98 , 550 . 00 for <br /> the City, as shown in the attached Preliminary SCHEDULE "I . " The <br /> 96289R <br /> -4- <br />