My WebLink
|
Help
|
About
|
Sign Out
Home
res_10838
Roseville
>
City Council
>
City Council Resolutions
>
10xxx
>
10800
>
res_10838
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2011 12:48:32 PM
Creation date
3/21/2011 12:42:10 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Resolutions
Meeting Date
9/13/2010
Resolution #
10838
Resolution Title
RESOLUTION APPROVING TRAFFIC CONTROL SIGNAL AGREEMENT FOR TH 36/HAMLINE COMMERCE/INTERSECTION MN/DOT AGREEMENT NO. 96289R
Resolution Date Passed
9/13/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
the work. Construction Cost does not include the cost of providing <br /> the power supply to the service pole or pad. A Preliminary SCHEDULE <br /> "I" is attached and incorporated into this Agreement . The <br /> Preliminary SCHEDULE "I" includes all County and City Construction <br /> Costs, and is based on engineer' s estimated unit prices and <br /> State-furnished materials lump sum amounts . The County and City will <br /> participate in the following construction at the percentage <br /> indicated: <br /> a. Traffic Control Signal on Trunk Highway No. 36 at <br /> County State Aid Highway No. 50 (Hamline Avenue) /Commerce <br /> Street/City Service Road. <br /> County share is 50 Percent . <br /> City share is 37 . 50 Percent . <br /> b. EVP System on Trunk Highway No. 36 at County State Aid <br /> Highway No. 50 (Hamline Avenue) /Commerce Street/City <br /> Service Road <br /> City share is 87 . 50 Percent . <br /> c . The County and City will pay a Construction <br /> Engineering charge in an amount equal to 8 percent of the <br /> total County and City Construction Cost, respectively, <br /> covered under this Agreement . <br /> 5 . The County' s and the City' s estimated total Construction Cost <br /> share, Lump Sum State-furnished Materials and Construction <br /> Engineering costs are $122 , 580 . 00 for the County and $98 , 550 . 00 for <br /> the City, as shown in the attached Preliminary SCHEDULE "I . " The <br /> 96289R <br /> -4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.