My WebLink
|
Help
|
About
|
Sign Out
Home
res_10838
Roseville
>
City Council
>
City Council Resolutions
>
10xxx
>
10800
>
res_10838
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2011 12:48:32 PM
Creation date
3/21/2011 12:42:10 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Resolutions
Meeting Date
9/13/2010
Resolution #
10838
Resolution Title
RESOLUTION APPROVING TRAFFIC CONTROL SIGNAL AGREEMENT FOR TH 36/HAMLINE COMMERCE/INTERSECTION MN/DOT AGREEMENT NO. 96289R
Resolution Date Passed
9/13/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The County, City and the State will participate in the cost, <br /> maintenance and operation of the new Traffic Control Signal and EVP <br /> System. <br /> CONTRACT <br /> 1 . The State will prepare the necessary plan, specifications and <br /> proposal (Preliminary Engineering) . <br /> 2 . The State, with its own resources or by contract, will remove <br /> the existing traffic control signal and install a new Traffic Control <br /> Signal and EVP System on Trunk Highway No. 36 at County State Aid <br /> Highway No. 50 (Hamline Avenue) /Commerce Street/City Service Road, <br /> pursuant to State Project No. 6212-159 (T.H. 36=118) , State Aid <br /> Project No' s . 062-650-009 and 160-020-023 , and City Project No. 10- <br /> 22 . <br /> 3 . The State will perform all construction engineering and <br /> inspection functions (Construction Engineering) in connection with <br /> the contract construction and perform all other acts and functions <br /> necessary to cause the construction contract to be completed in a <br /> satisfactory manner. <br /> 4 . The cost of construction (Construction Cost) consists of the <br /> contract cost of the work and State-furnished materials, or, if the <br /> work is not contracted, the actual cost of all labor, materials, <br /> State-furnished materials and equipment rental required to complete <br /> 96289R <br /> -3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.