R9SEVILLE <br />Volume 1 <br />March 31, 2011 <br />Project Summary <br />As part of the City of Roseville's ongoing street <br />maintenance program, streets which have curb and <br />gutter but have a poor driving surface are improved <br />using a mill and overlay process. This process <br />usually consists of grinding all or a portion of the <br />existing surface off the roadway and replacing it <br />with a new blacktop driving surface. As part of the <br />process, sunken or badly deteriorated curb and <br />gutter will be replaced. The following street <br />segments are included in this year's construction <br />contract: <br />Segment 1: Municipal State Aid Mill Overlay <br />County Road C2 (Snelling Ave to Hamline Ave) <br />Parker Avenue (Lexington Ave to Victoria Street) <br />Oakcrest Avenue (Cleveland Ave to Prior Ave) <br />Segment 2: Roseville Street Mill Overlay: <br />Aladdin Street (Rose Place to Cul -de -sac) <br />Cohansey Blvd (Crescent Lane to Irene Street) <br />Elmer Street (Wiliam St to Woodbridge St) <br />Evergreen Court (Skillman Ave to cul- de- sac) <br />Fisk Street (County Road C to Rose Place) <br />Garden Avenue (Hamline Ave to Lexington Ave) <br />Sherren St (Femwood Ave to Lexington Ave <br />Hythe Street (Draper Street to Roselawn Ave) <br />Rose Place (Fisk Street to Avon Street) <br />There will be no assessments for this mill and <br />overlay work. The cost to perform this pavement <br />maintenance is funded by existing City funds. A <br />schedule for this work is not available at this time. <br />We anticipate that this work will commence in May. <br />All work should be completed by September 2011. <br />Mill and Overlay projects typically take between 3 <br />to 5 weeks to complete. <br />Don't see your street? <br />If your street is not on the list above, you are <br />receiving this newsletter because this project will <br />impact how you access your neighborhood. Private <br />driveway and sanitary sewer work is only offered to <br />those property owners whose driveway or sanitary <br />sewer service is located on a street being tom up. <br />2011 Pavement <br />Management Project <br />Milling of existing pavement on Centre Pointe Dr. <br />Aladdin Street Water Quality Improvements <br />The runoff from Aladdin Street and the surrounding <br />hard surfaces drains directly into the wetland at the <br />south end of the cul- de- sac. The work on this <br />segment includes the construction of a rain garden <br />on the park side of the south end of the street. This <br />work will add about 2 weeks to the construction <br />schedule for this street segment. <br />Evergreen Court Watermain <br />The watermain on Evergreen Court will be <br />completely replaced prior to pavement <br />rehabilitation. This additional utility work will <br />require mailbox relocation, curb removal, and <br />temporary water system set up. This work will add <br />about 3 weeks to the construction schedule for this <br />street segment. <br />Questions? <br />As this project progresses, we will keep you <br />informed through direct mailing and the City <br />website. If you have any questions, or concerns <br />please contact us at 651 -792 -7042 between 8 am <br />and 4:30 pm. We look forward to working with you <br />on this project. <br />Check for construction updates at: www.cityofroseville.com/2011PMP <br />