Laserfiche WebLink
Unique <br />ID <br />Title <br />Measurable Goal <br />Implementation Status <br />lc -5 Education Program <br />I Yes' No <br />Post construction Storm <br />Water Management in New <br />Development and <br />Redevelopment <br />See 5a -1, 5b-1, 5c -1 <br />x <br />Currently in place and will continue. Annually solicit and develop new materials <br />lc 6 Education Program <br />Pollution Prevention Good <br />Housekeeping for Municipal <br />Operations <br />See 6a -1, 6a -2, 6b-1, 6b-2, 6b-3, 6b-4, 6b-5, 6b-6, 6b-7 <br />x <br />Currently in place and will continue. Annually solicit and develop new materials <br />1d 1 Coordination of Education Program <br />See la-1, lb-1, lc-1, lc -2, lc-3, lc -4, lc -5, lc -6 I 1 x 1 Currently in place and will continue. Annually solicit and develop new materials <br />le 1 Annual Public Meeting <br />Meeting completed X Meetings conducted annually prior to the SWPPP submittal <br />BMP Area 2: Public Participation and Involvement Measures <br />2a -1 <br />Comply with Public Notice Requirements <br />Completed public notice requirement (y /n) <br />X <br />30-day notice for annual storm water public meeting will be published every year <br />through the life of the permit. <br />2b 1 Solicit Public Input and Opinion <br />Number of locations notice was posted <br />4 <br />on the Adequacy of the SWPPP <br />Meeting completed <br />X <br />Meetings conducted annually prior to the SWPPP submittal <br />2c 1 Consider Public Input <br />Date of meeting <br />May 25, 2010 <br />Number of comments 1 1 X 1 Annual <br />2d 1 Public Outreach <br />1 Earth Day <br />Celebration complete (y /n) <br />X <br />Currently in place and will continue. Annually solicit and develop new materials <br />Number of participants <br />500 <br />This celebration was held at Harriet Alexander Nature Center. Where a tree <br />planting ceremony was held. <br />2 <br />Spring Clean up Day <br />Spring Cleanup Day completed (y /n) <br />412 vehicles brought in <br />material to drop off <br />X <br />Currently in place and will continue: Summary of material dropped off: Mixed Solid <br />Waste (MSW)14.23 tons, Construction Demolition Debris (C &D) 5.45 tons, Metals <br />3.28 tons, Batteries 12, Tires 51, Appliances 56, Small Engines included in scrap, <br />Electronics 10.57 tons, concrete 1.5 ton, carpet negligble. <br />3 "Adopt -a- Park" Program Number of parks adopted 28 Currently in place and will continue <br />4 <br />Storm Drain Stenciling <br />Program <br />Number of volunteer projects completed <br />0 <br />x <br />Currently in place and will continue- No volunteers this year <br />5 <br />Lake Monitoring <br />List of lakes monitored <br />Lake Josephine; Lake <br />McCarrons; Lake <br />Owasso; Bennett Lake; <br />Willow Pond <br />X <br />Currently in place and will continue visual periodic inspections. <br />NPDES PHASE II Permit <br />City of Roseville 2010 Annual Report <br />Best Management Practices Minimum Control Measures <br />Faye 2 05 <br />