My WebLink
|
Help
|
About
|
Sign Out
Home
2010-10-28_Minutes
Roseville
>
Commissions, Watershed District and HRA
>
Grass Lake WMO
>
Minutes
>
201x
>
2010
>
2010-10-28_Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2011 12:09:15 PM
Creation date
4/27/2011 12:08:11 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Grass Lake WMO
Commission/Committee - Document Type
Minutes
Commission/Committee - Meeting Date
10/28/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Further discussion included the history of involvement of the two firms in water management <br />and work with watershed districts and /or cities; review of information provided by references <br />given by the companies by Chair Ferrington; and how each firm addressed specifics of the RFP. <br />Member Manzara expressed concern that the EOR proposal didn't extensively address positive <br />ways to ensure citizen and stakeholder involvement. <br />Chair Ferrington noted that, of the six firms having contacted him during the RFP process, EOR <br />asked the most detailed questions, mostly of a technical nature, indicating that their firm was <br />aware of the basic philosophy and requirements of the GLWMO. <br />Chair Ferrington noted that, following his contact with Barr, it appeared their response to the <br />RFP revolved around their review of the GLWMO web page, meeting minutes and the budgeted <br />funds set aside for development of the plan; however, he noted that their projected budget was <br />not in line with the public information provided for available funds. Chair Ferrington cautioned <br />that, if that firm was chosen, there needed to be a clear expectation by the Board and the firm of <br />the differential in funds budgeted by the GLWMO versus the total estimate for developing the <br />plan. The Chair also felt it necessary for the Board to determine made on how to fund that <br />overrun of projected costs if Barr turned out to be the consultant of choice by the Board. <br />Member Manzara suggested that, as a part of the process, the Board could consider writing a <br />minimum 20% contingency into the projected budget to anticipate overruns. However there was <br />no discussion of where the necessary funds would be found to cover such a contingency. <br />Member Eckman opined that the timeline for Barr was too long compared to EOR, with some <br />tasks not included in the costs. Member Eckman noted the need for a very good understanding <br />by the firm and the Board of additional costs, and timely payment of expenses. <br />Member Manzara opined that, as a committee, additional discussion may be necessary to <br />determine the level of Board commitment and to develop a meeting schedule over the next year <br />to accomplish the work required; with a clear schedule agreed upon by the firm and the Board <br />upfront. <br />Member Westerberg noted that EOR had already identified the need for a single point of contact <br />or small committee to facilitate effective progress. <br />Member Eckman noted that the principal of EOR was a resident of Roseville, which may help <br />facilitate meeting schedules. <br />At the request of Member Eckman, Mr. Schwartz confirmed that the principal worked previously <br />with Capitol Region Watershed District. <br />Member Eckman advised that she had spoken to the EOR principal earlier today and had <br />confirmed that he had never served on the GLWMO, that he resided in Roseville close to Lake <br />Owasso, but without any deeded access, nor was he a member of a lake association. <br />4 <br />