My WebLink
|
Help
|
About
|
Sign Out
Home
2011-02-17_Minutes
Roseville
>
Commissions, Watershed District and HRA
>
Grass Lake WMO
>
Minutes
>
201x
>
2011
>
2011-02-17_Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2011 2:05:42 PM
Creation date
4/27/2011 2:04:45 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Grass Lake WMO
Commission/Committee - Document Type
Minutes
Commission/Committee - Meeting Date
2/17/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
47 <br />48 <br />49 <br />50 2010/2011 GLWMO BMP Cost -share Program <br />51 <br />52 Ryan Johnson, Ramsey Conservation District (RCD): <br />53 <br />54 Mr. Johnson provided a review and highlights of the 2010 program, and presented some changes <br />55 for the program in 2011. Mr. Petersen noted that the GLWMO Board needed to consider action <br />56 on a revised Professional Services Agreement with the RCD for the 2011 program, including the <br />57 proposed changes to the program. Discussion during the 2010 program review presentation <br />58 included: forms available on the website for BMP projects; the need to rearrange the website for <br />59 easier public access to information regarding the program. It was suggested that our educational <br />60 information regarding the cost -share program include information of the ratio of phosphorous to <br />61 algae in water resources as a way to reinforce the need to manage stormwater at the source <br />62 before it can flow to our lakes; the 5 -year maintenance requirements for this funding was also <br />63 reviewed. Mr. Johnson advised that it was his intent to make available more frequent reports to <br />64 the GLWMO Board in 2011. Mr. Johnson emphasized the need for the GLWMO website to be <br />65 updated and provide easier public access from the home page. There was discussion regarding <br />66 suggested changes to the program for 2011. It was suggested, by Chair Pro -tern Eckman, that the <br />67 GLWMO cost -share program be advertized at an upcoming Native Plant Expo and Market event <br />68 that she is part of.. There was further discussion regarding printing a "Post- card" about the cost <br />69 share program, which should include a map of the GLWMO boundaries. Further discussion was <br />70 directed at target projects to be reported to BWSR and the need to know as soon as possible how <br />71 BWSR plans to allocate grant funds in the next grant cycle. Mr. Petersen suggested GLWMO <br />72 sponsorship of a public workshop(s) for Lake Owasso, Wabasso Lake and Snail Lake <br />73 homeowners to prepare for a future BWSR grant and develop interest in the cost -share program <br />74 for 2011. Mr. Petersen sought authorization by the Board to direct him to work with Mr. <br />75 Johnson to focus on this specific ideas. An early spring workshop(s) was determined to be most <br />76 appropriate. Ms. Correll suggested that it might be appropriate to give a Watershed District tours <br />77 and visit past shoreline restoration sites to provide examples of possible projects. Mr. Johnson <br />78 advised that the RCD had achieved good success and attendance at workshops in the past, <br />79 including attendance by the public and County /city officials. Ms. Correll suggested that a <br />80 condition of cost -share funding through the BMP program be that the project site becomes <br />81 available for tours and for educational information to others. <br />82 Further discussion included location and availability of DNR signs indicating lakeshore habitat <br />83 restoration activities. Mr. Johnson suggested raising cost sharing funding caps for 2011 from <br />84 $1,000 to $2,500 for applicable shoreline projects. Mr. Johnson also suggested that consideration <br />85 be given to increasing the caps for rain garden funding as well. He suggested that amount be <br />86 increased from $600 to $1,000. Mr. Petersen provided an update of funds rolled over from 2010 <br />87 for BMP cost -share projects with over $11,000 currently available in cost -share funds. <br />88 Discussion ensued regarding the components applicable for cost -share funds currently (plant <br />89 installation, not retaining walls or labor) and a cap on total material costs (50% of total material <br />90 costs); and whether to consider changing from cost -share on only material to include total project <br />91 costs. Mr. Johnson advised that the typical cost for a rain garden was $600 $800; and that <br />92 excessive costs were usually not an issue. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.