Laserfiche WebLink
93 <br />94 <br />95 Mr. Petersen sought clarification on the type of BMP's the GLWMO wanted to target, and if <br />96 shoreline restoration, suggested a higher cap at $2,500 and less of a cap of $1,000 for rain garden <br />97 installations, but both higher than currently allotted. Member Miller expressed his support for <br />98 raising both caps and prioritizing shoreline management. <br />99 <br />100 Motion 11 -02 -02 <br />101 Member Miller moved, and Member Westerberg seconded revising the BMP cost -share program <br />102 from fifty percent (50 materials to fifty percent (50 total project cost; limiting in -kind labor <br />103 at $10 per hour; and capping total participation of GLWMO funds at $1,000 for rain garden <br />104 installations and $2,500 for shoreline restoration projects. <br />105 <br />106 Ayes:3 <br />107 Nays: 0 <br />108 Motion carried. <br />109 <br />110 TMDL Studies and Retro -fit Analysis of stormwater Systems <br />111 Mr. Johnson continued his presentation with discussion of stormwater system retrofits studies in <br />112 relation to TMDL requirements. It was noted that the MPCA has received our request for TMDL <br />113 study funding with a response anticipated within several months. Further discussion included <br />114 building on the April 2009 Barr Eng. Study of Lake Owasso "Lake Owasso Use Attainability <br />115 Analysis Study" by doing a targeted study of those sub watersheds that had already been <br />116 identified as sources of phosphorous; creating cooperative projects with the City of Roseville and <br />117 the RCD such as the street reconstruction projects that were submitted for funding in 2011 (i.e., <br />118 the Dale Street project). <br />119 <br />120 2011 Professional Services Agreement between the GLWMO and the RCD <br />121 <br />122 Motion 11 -02 -03 <br />123 Member Westerberg moved, and Member Miller seconded authorizing the Chair Pro -tern to sign <br />124 a contract with the Ramsey Conservation District (RCD) for technical services for 2011 with <br />125 payments made quarterly and total annual costs not to exceed $6,500. <br />126 <br />127 Ayes: 3 <br />128 Nays: 0 <br />129 Motion carried. <br />130 <br />131 At the suggestion of Mr. Petersen, it was the Board's consensus that the current pending project <br />132 as identified be included under revised cost -share caps. <br />133 <br />134 As a follow -up to a past cost -share project that was constructed (by the RCD, Prince of Peace <br />135 church, and the City of Roseville) within GLWMO, Chair Pro -tern Eckman requested that RCD <br />136 follow -up with Prince of Peace Church to complete the repairs that were identified in 2010. The <br />137 quality of Bennett Lake is affected by this project. Mr. Johnson noted that in past meeting <br />3 <br />