My WebLink
|
Help
|
About
|
Sign Out
Home
2011-06-28_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2011
>
2011-06-28_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2011 9:08:16 AM
Creation date
6/28/2011 8:53:24 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
6/28/2011
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item Description: Communication Items <br />Recommended Action: <br />None <br />Roseville Public Works, Environment and <br />Transportation Commission <br />Agenda Item <br />Date: June 28, 2011 Item No: 4 <br />Projects update <br />o Check for City Construction project updates at: www .cityofroseville.com /projects <br />o 2011 PMP- The Contractor is nearly complete with the utility work.on Dale Street <br />between County Road C and South Owasso Blvd. Grading will begin next week <br />with curb and gutter to follow. Paving has been completed on some segments of <br />the mill and overlay streets. Weekly updates are available at <br />www. cityofroseville.comlDaleStreet <br />www. citvofroseville. comistreetmaintenance. <br />o Rosewood Neighborhood Drainage Improvements: The Contractor will be <br />working on final restoration in the next two weeks. <br />o Applewood Pointe- The watermain is nearly complete. The sanitary sewer has <br />been completed. Storm sewer and grading will commence when the weather <br />cooperates. <br />o William Street Pond: the Contractor will be moving the excavated material in the <br />next week or so. <br />o Rice Street Project: The Contractor has completed our watermain construction. <br />Currently installing sidewalk, bridgework, and ramp work. The bridge should be <br />open by the end of July barring a state shutdown. <br />o Sanitary Sewer Lining- this project is complete. <br />Budget process update <br />Potential State Government shutdown impacts <br />Other <br />Attachments: <br />A. 2011 Pavement Management Project Newsletter <br />B. <br />
The URL can be used to link to this page
Your browser does not support the video tag.