Laserfiche WebLink
Regular City Council Meeting <br />Monday, June 13, 2011 <br />Page 13 <br />11. Public Hearings <br />Councilmember Johnson asked that, in their study of traffic management options, <br />the PWET Commission also consider crosswalks, especially those on larger roads <br />with multiple lanes and right turning traffic, and visual /safety concerns. <br />Member Stenlund noted, from his experience, the difficulty in solving those con- <br />cerns, when dealing with fractured communities and landscapes and the blurring <br />of community lines; while attempting to maintain traffic flow and keep pede- <br />strians safe. Member Stenlund noted the need for safe oasis for everyone to get <br />across, since not everyone can cross a wide street with multiple lanes in one sig- <br />nal light change, and the need to accommodate those pedestrians. <br />Mayor Roe concurred, noting that drivers were not necessarily doing what they <br />needed to do to ensure pedestrian safety, especially before turning right; and the <br />need to be conscious of how you were driving and the reason for rules of the road <br />for vehicles, pedestrians, and bicycles. <br />Further discussion on neighborhood traffic management included options, such as <br />speed humps and pedestrian crosswalks; traffic speed through residential neigh- <br />borhoods; pros and cons of closures of neighborhood roads to eliminate cut <br />through traffic. <br />Councilmember Willmus opined that everyone needed to be cognizant as a first <br />ring suburb in the number of vehicles, pedestrians and bicycles now and in the fu- <br />ture; not to restrict them but to move them more efficiently and safely. <br />Mayor Roe opined that the policy discussion needed to identify consistent criteria, <br />when it was appropriate to close a road as a solution; and what conditions or stan- <br />dards were applied consistently for those types of decisions, not just responding to <br />passionate citizen input, but based on best practices. Mayor Roe looked to the <br />PWET Commission to point the City and City Council in the right direction. <br />a. Conduct a Public Hearing for a Variance to the Noise Ordinance to Extend <br />Construction Activity Hours at the Rosedale Square Shopping Center <br />Permit Coordinator Don Munson briefly summarized the request as detailed in the <br />RCA dated June 13, 2011. Mr. Munson advised that mailed notices of tonight's <br />Public Hearing were provided to properties within 500' of the site; but to -date, <br />staff had received no phone calls. Mr. Munson advised that representatives from <br />Welsh Companies, the applicant, and Minnesota Roadways, the contractor, were <br />in the audience and available for questions as applicable. <br />Mayor Roe opened the Public Hearing at 7:29 p.m. for the purpose of hearing <br />public comment on the request for a variance to the City's Noise Ordinance to ex- <br />tend construction activity hours at Rosedale Square Shopping Center, 1601 <br />