Page 2 of 3 <br /> 3 <br /> 37 The Second Part of the Recommendation <br /> 38 <br /> 39 Utility Needs. <br /> 40 <br /> 41 Background. The fee-supported Utilities in the City with significant urn-funded capital reeds are <br /> 42 the water Utility,the Sanitary Sewer Utility, and the Stormwater Uitility. These utilities all <br /> 43 consist largely of underground piping systems that were installed over a period from the 1940's <br /> 44 to the 1970's as the City developed. In addition, the water Uitilty includes the City's water <br /> 45 tower, and the Stormwater futility includes a number of City-maintained stormwater management <br /> 46 ponds. This capital infrastructure is provided by the City to deliver safe drinking water to the <br /> 47 homes and businesses in the City,to take away sanitary sewer wastewater to the Metropolitan <br /> 48 Council's sewer system and treatment facility for safe treatment, and to safely collect stormwater <br /> 49 ran-off, treat it, and deliver it to the environment via the streams, lakes, and other waterways of <br /> o the area. <br /> 1 <br /> 52 Much of the piping in these systems is approaching 50-60 years of age, and was made of <br /> 53 materials that have been found to not last much longer d=that, if even that long. The cast iron <br /> 54 of the water mains is brittle and subject to leafing and breaks as the result of ground shifting, <br /> tree roots, etc. The clay the of the sanitary sewer lines is similarly subject to leafs and breaking. <br /> 56 Since the City pays St. Paul for dxinkm" g water, each leaf or brew in a line costs the City's <br /> 7 residents and businesses higher rates to account for that un-used water we purchase. Leaks of <br /> 58 raw sewage into the ground pose a danger to the environment. <br /> 59 <br /> 60 In an effort to keep current and future costs down, the City is using new materials and <br /> 61 technologies to replace or repair existing water and sewer mains. where City streets are being <br /> 62 completer replaced, the water and sewer lines are being replaced as needed) with more durable <br /> 3 materials. where streets are not programmed for replacement for many yews, the City is using <br /> 64 re-lining technology that puts a new plastic pipe inside the existing pipe, and does not rewire <br /> 65 excavation of the street. <br /> 66 <br /> 67 The capital infrastructure funding gala over the next 20 years in these Utility funds is about 47 <br /> 8 million out of total projected costs of 65 million. In other words, 72%of the projected costs are <br /> 9 currently un-funded. <br /> 70 <br /> 71 Recommendation. The subcommittee recommends a long-term solution for funding the <br /> 72 significant capital replacement needs of these Utilities that is a combination of adding revenues <br /> 73 and transferring existing funds. <br /> 74 <br /> 75 The first part of the recommendation is to increase the annual utility base fees by a total of$2.2 <br /> 76 million in 2012, and to maintain that increase permanently going forward. Approximately <br /> 77 $850,000 of that amount would be dedicated to water futility capital funding, approximately <br /> 78 $830,000 to unitary Sewer Utility capital funding, and the remairung approximately$500,000 <br /> 79 would be dedicated to Stormwater Utility capital funding* <br /> 80 <br />