My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-05-11-PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2010-2019
>
PC Packets 2011
>
01-05-11-PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2015 3:15:33 PM
Creation date
1/5/2011 12:41:51 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Proposal and Process <br />1. Project Description <br />The project would be completed in a single phase. The existing building would be razed. <br />The proposed site plan would reorient the front entrance of the building, along with an <br />outdoor seating area, to face County Road E. The driveway entrances would remain in their <br />existing locations; however, the parking area would be located between the building and <br />Connelly Avenue. The drive -thru capacity would be expanded with a double drive -thru that <br />would wrap around the north and west sides of the building. Additional landscaping would <br />be installed as part of the redevelopment. A detached garbage enclosure would be located in <br />the far northwest corner of the property. Loading doors would be located on the east side of <br />the building facing Connelly Avenue. <br />The applicants have submitted a project narrative describing their request (Attachment A), <br />and a plan set detailing the proposed site plan (Attachment B). <br />2. Planned Unit Development (PUD) Process: <br />The PUD process is a tool that provides additional flexibility for developments that an <br />underlying zoning district would not otherwise allow. For example, a PUD may alter the <br />setbacks, lot coverage, density, parking requirements, building height, landscaping <br />requirements, etc. The flexibility from the minimum requirements in the underlying district <br />may reduce a specific requirement, or it may increase it. The intent is to provide flexibility <br />to a project in exchange for improvements or amenities that a City could not otherwise <br />require. With any development, the conditions imposed on the project must have a rational <br />basis related to the impacts of the development. <br />The PUD process is an alternative to the variance process and requires distinct findings <br />separate from the undue hardship criteria in State Statutes. The process is meant to create a <br />better development than the strict adherence to the standard regulations might otherwise <br />allow. While each PUD process is unique, it is a common process used by many cities. The <br />PUD process cannot be used to permit uses that would not otherwise be permitted in the <br />underlying zone. <br />3. Surrounding Area: <br />North <br />South <br />East <br />West <br />Community Mixed Use <br />Community Mixed Use <br />Community Mixed Use <br />ROW Highway 51 <br />B -2: General Business District <br />B -2: General Business District <br />B -2: General Business District <br />ROW Highway 51 <br />Parking Lot and Pot -O -Gold Bingo <br />Gas and Service Station <br />Bowling Alley <br />ROW Highway 51 <br />City of Arden Hills <br />Planning Commission Meeting for January 5, 2011 <br />Page 2 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.