c. Carpet base damage in corridors. <br />d. Mold damage on carpet in a few locations. <br />e. VCT tile damage in I4 percent of buiIding. <br />f. Ceiling tile in corridors damaged from water intrusion. <br />g. Significant water damage on lake side of building. <br />h. Mold visible in one office space and several basement (tunnel) spaces. <br />i. Repair tile base. <br />j. Re-caulk tub/floor edge. <br />k. Remove exposed security cable in corridors. <br />Bxteriar Construction <br />a. �'ascia and soffits in need of repair, paint. <br />b. Gutters are darr►aged arid need replacement. <br />c. Missing window sills. <br />d. Brick requires tuck-pointing. <br />e. Paint all exterior waod surfaces. <br />f. Hollow metal door frames rusting away. <br />g. Re-grade courtyards to prevent water intrusion, <br />Overview of Candition Deficiencies <br />The Lake View building has defects in structura� elements including most of the exterior envelope, allowing <br />water intrusion into the building. In addition, the building has deficiencies in all f ve cat�gories Iisted above, <br />incl�zding serious deficiencies in the mechanical system, domestic water supply and accessibility. <br />The building is currently functioning as a viab�e senior assisted living facility due to the heroic efforts of a <br />caring maintenance staf£ They are continually applying "band aides" to building systems because permanent <br />fixes are impractical from a financial and physical perspective. Currently, the heating, cooling and domestic <br />water is routed through a complex, antiquated tunnel system that is pa�-tially inaccessible to maintenance staff, <br />making repairs castly and unsafe, if not impossible. <br />Almost every bathroom in the buiiding requires a complete remodel, including new door openings, to alIow <br />enough space for wheeIchair movements. This is especially critical in an assisted living facility where the <br />inobility of the residents is a challenge. If there were enough space in each unit to expand the bathroom (and <br />that is daubtful), the cost of the remodeling would exceed the practical limits in a building of this vintage, <br />especially when combined with the other signiiicant remodeling required throughout the facility. <br />In total, the defects and deficiencies in tlus building are of sufficient tatal significance ta justify substantial <br />renovation or clearance. <br />Descri tian of Code Deficiencies <br />i. Install a new ventilation system to provide code required ventilation to current ASHRAE standards {IBC <br />1203.1). <br />2. The roof is at ihe end of its service tife al3owing water intrusion in building. Tear-off and replace roof, <br />flashings and copings (IBC 1503.1). <br />3. Bathroorns do not meet accessibility requirements (IBC Chapter 29). Replace existing batk�rooms with <br />new accessible bathrooms. <br />4. Replace four elevators to meet current elevator code (MN RuIe 1307) <br />5. Replace Domestic water supply system, eliminating all piping in concealed spaces. <br />6. Waterproof foundation walls and floors ta eliminate water intrusion into building. <br />7. Mechanical system is not adequate. I.,ack of working controls, failing circulation pumps, plugged reheat <br />coils, lack o� cooling supply and control to memory care. <br />8. Inadequate generator back-up power. <br />9. Insulate pipes under bathroom sinks. <br />