My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7J Zoning Code Amendment for B2 Interim Use
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2008
>
03-31-08-R
>
7J Zoning Code Amendment for B2 Interim Use
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 9:40:22 AM
Creation date
2/10/2011 10:46:36 AM
Metadata
Fields
Template:
General
Document
3-31-08 Council Regular
General - Type
3-31-08 Council Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Arden Hills Chapte�r 13 Zoning Code <br />B. Public Hearing. A public hearing i� required at the Master Plan Stage. <br />The public hearing may be combined with the public hearing �'ar a zoning <br />district change if a zoning district change is required and for a prelxminary <br />plat if a preli�aninary plat of the PUD property is proposed. <br />C. Action to Approve. A 4/5 vate of the fizll Cottncil is required for <br />approval of the Master P1an. <br />D. Effect of Concept Alan Revier�v. The applicant for a PUD Concept <br />Plan which has been reviewed by the Council has no limitation on the <br />period of time in which to apply for Master Plan approval. <br />E, Effect of PUD Master Plan Approval. The applicant for a PUD Master <br />P1an which has been approved by the Council shall apply far a�UD �inal <br />Plan or the first stage o� the Master Plan within six (6) xnonths, unless <br />some other phasing plan has been approved by the Council ar unless a <br />written request for a time extension has been approved by the Council. <br />F. Final P1an. The applicant shall submit a Final Plan for all �lements of <br />the Master Plan that are to be developed izn�xninently. A PUD �inal �lan <br />shall be submitted for each stage of development/construction. <br />G. Final Plan Procedure. The Site Plan Review pzocess in Appendix A, <br />Procedure Ma,nual, and the Site Plan Review proceduxe in Chapter <br />1355.04 Subd 5 shall be followed. <br />Subd. 7 Intearim Use Permiis. <br />A. Purpose and Intent. The purpose and intent of allowing interim uses <br />is: <br />1. To allow a use #hat is presently accepiable, but that with <br />anticipated development or redevelopment, will not be accepYable in <br />the filture or will be replaced by a permitted or conditional use allowed <br />within the respective zoning distr�ct. <br />2. To allow a use which is reflective af anticipated Iong range change <br />to an area and which is in compliance with the Comprehensive Plan <br />provided that said use maintai.ns harmony and compatibility with <br />surrounding uses and is in keeping wit� the architectural character and <br />design standards of existing uses and dev�iopment. <br />B. Public Hearing. A public keariing zs required. <br />Section 1355 —Administration and Parocedures <br />Adopied: November 13, 2006 <br />Page 8 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.