My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7B, McDonald's Master and Final Planned Unit Development
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2011
>
02-28-11-R
>
7B, McDonald's Master and Final Planned Unit Development
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 10:31:30 AM
Creation date
2/25/2011 2:35:32 PM
Metadata
Fields
Template:
General
Document
2/28/11 Regular City Council Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Conneliy Avenue. The drive-thru capacity wauid be expazaded with a dou�ie c�rive-thru that <br />would wrap around ihe north and west sides of the building. Additional Iandscaping vvould <br />be installed as part of the redevelop:nnent. A detached garbage enclosure would be located in <br />the far north�vest corner o� the property. Loading doors would be located on the east side of <br />th� building facing Connelly Avenue. <br />The applicants have submitt�d a project narz�ative describing their request, and a plan set <br />detailing the proposed site pian (Attachment D). <br />2. Planned Unit Development (PUD} Process: <br />The PUD process is a tool that provides additional flexibility for derrelopments that an <br />underlying zoning district �vould not otherwise allow. For example, a PUD naay al�er the <br />setbacks, lot coverage, density, parking requirements, building height, Iara.dscaping <br />requirements, etc. The flexibility from the minimum requirements in the underlying district <br />may reduce a specific requirement, or it may increase it. The int�nt is to provide flexibility <br />to a project in exchange far impxovements or amenities that a City could not otherwise <br />require. With any developrrzent, the conditions imposed an the project must hav� a rational <br />basis related to the impacts of the development. <br />The PUD process is an alternative to the variance process and requires distinct findings <br />separate from ihe undue hardship criteria in. State Statutes. The process is rneant to create a <br />better developmeni than th� strict adherence to ihe standard regulations might otherwise <br />allow. While each PUD process is unique, it is a common pracess nsed by many cities. The <br />PUD process cannot be used to permit uses that r�vouid not otherwise be permitted in the <br />underlying zone. <br />3. PUD FlexibiIity <br />McDonald's is seeking flexibiliry on a number of itez�s within the Zoning Code. The <br />flexibility requests are outlined in detail in the January 5, 201 l, repart to the Planning <br />Commission (Attachmeni C). A summary of t17e flexibility requested is as �ollows: <br />• Planting Islands — Deficit of 167 square feet. Additional perennial and shrubbery <br />plantings are provided eisewhere an the site, in excess of 2,175 square feet from <br />minirn.um Code requirernents. <br />• Building Design — Code requires at Ieast 50 percent of the building be constructed to <br />the front setback line of 20 feet. The building would be setback 48 feet from the front <br />property line. <br />• Comrnercial Fa�ade Transparency — At Ieast 50 perceni of the sides of the building <br />facing sireet are required to be tratlsparent glass. The sauth fa�ade would have 48 <br />percent transparent glass, while the east fa�ade would have 18 percent. <br />City of�4rden Hilds <br />City Council Meeting for November 29. 2010 <br />C: IDOCUME IIME,4GAN 1.BEElLOC,4LS 11Temp1ELF201 ]0225_101339102-28-11 - CC Memo - McDonalds.doc <br />Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.