Laserfiche WebLink
3. Construction of "Main Street" off of County Road E and Drive Aisles off of <br />Lexington. <br />Both the Previous Plan and Current Plan include the same reconstruction of the access <br />drives off of County Road E and Lexington Avenue. As it relates to the "Main Street" <br />effect off of County Road E, both plans include the circular special paving, sidewalks, <br />lighting, and landscaping. <br />4. Sidewalks <br />Both the Previous Plan and Current Plan contemplate some new sidewalks. The Current <br />Plan has a different pedestrian access point to the pharmacy site than the Previous Plan. <br />5. Building #2 <br />Both the Previous Plan and the Current Plan contemplate Building #2, located on the <br />Main Street, as part of Phase 2. The Current Plan indicates a size of approximately 6000 <br />square feet rather than the 5582 square feet in the Previous Plan. <br />Both the Previous Plan and the Current Plan contemplate an interim grass pad site for <br />Building #2. <br />6. Existing Retail Parking Areas <br />The Previous Plan contemplated work in the existing parking lot to the east of the <br />existing retail center. The Current Plan does not include that work, except to the extent <br />required by the watershed district storm water permit. <br />7. Building #4 Interim Pad <br />The Previous Plan contemplated the removal of the existing retaining wall near the <br />Lexington drive aisles along with a grass interim pad for Building #4. The Current Plan <br />does not contemplate the removal of parking in that area or the removal of the retaining <br />wall. <br />Let me know if you need additional information at this time. <br />Denny Trooien <br />cc: Steve Wellington <br />Jon Lennander <br />2 <br />