My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1A.1, TCAAP Market Analysis and Comprehensive Plan Discussion
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2013
>
01-28-13-WS
>
1A.1, TCAAP Market Analysis and Comprehensive Plan Discussion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2013 3:19:25 PM
Creation date
1/25/2013 3:19:09 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Both the 2030 Comprehensive Plan and the zoning regulations contemplated a 585-acre TCAAP <br /> site that included 460 acres for development, right of way, parks and open space, and stormwater <br /> management; 49 acres for a wildlife corridor; and 76.5 acres for the Primer-Tracer area. <br /> Ramsey County's acquisition of the TCAAP property includes only 427 acres, all of which are <br /> anticipated for development, right of way, parks and open space, and storm water management. <br /> The County will separately acquire 30.5 acres(of the original 460 acres of developable land)to use <br /> as a north-south trail corridor, as well as 49 acres for the wildlife corridor (Attachment A). The <br /> 76.5-acre Primer-Tracer area is anticipated to be reabsorbed into AHATS. <br /> Ramsey County has contracted with Maxfield Research to complete a Market Potential Analysis <br /> for the 427-acre TCAAP site. The analysis is not yet complete;however,Maxfield has prepared a <br /> draft with preliminary findings. The market analysis is a snapshot in time that reflects the <br /> possible market potential for development on TCAAP over a 5-year time period. The County <br /> intends to update the study in 2 years, and then update it annually after that. It is likely that the <br /> numbers suggested in the market analysis will change over time. <br /> 2030 Comprehensive Plan Review <br /> When the 2030 Comprehensive Plan was adopted in 2008,the City had not yet approved a master <br /> plan for the TCAAP site. In lieu of a detailed master plan,that City adopted a vision for the future <br /> use of the TCAAP site based on previous planning efforts,but with less detail than a typical master <br /> plan. The future land use designations were generally split down the center of the property with <br /> Mixed Business identified for the west side of the site, and Mixed Residential identified for the <br /> east side. It was anticipated that once a TCAAP master plan was adopted by the City that the <br /> 2030 Comprehensive Plan would need to be amended. The Comprehensive Plan specifically <br /> states that"Upon selection of a land use plan, this Comprehensive Plan will be amended to reflect <br /> the approved land use designations in TCAAP". <br /> The future land use map includes just two land uses,Mixed Business and Mixed Residential. The <br /> 2030 Comprehensive Plan anticipated that there would also be institutional uses, parks, wetlands, <br /> and roads on the property; however, their exact locations and acreage had not been determined. <br /> The most recent unapproved concept plan for TCAAP included the following land uses: <br /> City of Arden Hills <br /> City Council Meeting for January 28, 2013 <br /> P:IPlanninglCity Council Memos12013WI-28-13-TCAAP Market Study Discussion-Memo.docx <br /> Page 2 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.