My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-18-96
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Economic Development Commission (EDC)
>
EDC Packets
>
1996
>
09-18-96
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2013 4:32:58 PM
Creation date
3/7/2013 4:31:06 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. U of M -10 minutes; <br /> 2. St. Paul - 12 minutes; <br /> 3. Minneapolis Downtowns - 12 minutes; and <br /> 4. International Airport - 25 minutes. <br /> A motion was made to leave the brochure as is, except for the changes <br /> stated. The Staff will contact Terry Nagle regarding the interior of the <br /> marketing brochure. The Staff will draft a letter to the City Council <br /> requesting use of the budgeted funds for the printing of the marketing <br /> brochure after the entire brochure is complete and reviewed by the EDC. <br /> Motion carried 8-0. <br /> 5. BANNERS <br /> The banners along County Road E need to be replaced, in the past, the <br /> banners have been purchased through private donations. The City does <br /> not have the right equipment to replace the banners. The Staff prepared <br /> two estimates on the cost to replace the banners. The first estimate (5 year <br /> life expectancy) is based on providing two banner themes (Spring/Summer <br /> & Fall/Winter). The second estimate (7 year life expectancy) is based on <br /> providing four banner themes (Spring, Summer, Fall, and Winter). The <br /> cost estimates for the purchasing of the banners and the rental equipment <br /> is as follows: <br /> 1. $7,267.31 for 20 banners two (2) times a year, Spring/Summer and <br /> Fall/Winter, with brackets and equipment rental. <br /> 2. $14,271.33 for 20 banners four(4) times a year, Spring, Summer, <br /> Winter and Fall, with brackets and equipment rental. <br /> The Staff informed the EDC that with proper equipment the 20 banners <br /> could be alternated in approximately four(4) hours. <br /> The EDC concluded that banners should be purchased through donations <br /> from the business along County Road E and charitable organizations. Ray <br /> McGraw and Ted Brausen volunteered to contact the businesses on <br /> County Road E to obtain their comments and possible donations, and <br /> report back the information at the next EDC meeting. <br /> 6. COUNCIL REPORT <br /> Councilmember Aplikowski stated that the Council is in the process of <br /> looking at the development of the five (5) year street maintenance <br /> program. <br /> The Council is the process of finalizing the 1997 budget. • <br />
The URL can be used to link to this page
Your browser does not support the video tag.