My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-08-13-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2013
>
04-08-13-R
>
04-08-13-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2013 8:41:48 AM
Creation date
4/8/2013 8:41:31 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS CITY COUNCIL JANUARY 28, 2013 3 <br /> <br /> <br />5. CONSENT CALENDAR <br /> <br /> <br /> <br />A.Motion to Approve Consent Agenda Item - Claims and Payroll <br /> <br />B.Motion to Approve City Code Amendments to Section 330.02 Gambling <br /> <br />C.Motion to Accept Metropolitan Council I/I Grant Agreement <br /> <br />D.Motion to Authorize Acquisition of Triangle Parcel Property <br /> <br />MOTION: Councilmember Holmes moved and Councilmember Werner seconded a <br />motion to approve the Consent Calendar as presented and to authorize <br />execution of all necessary documents contained therein. The motion carried <br />unanimously (5-0). <br /> <br />6. PULLED CONSENT ITEMS <br /> <br />None. <br /> <br />7. PUBLIC HEARINGS <br /> <br /> <br />None. <br /> <br />8. NEW BUSINESS <br /> <br />A. Proposals for Engineering Services South Water Tower Rehabilitation <br /> <br />Public Works Director Maurer <br />stated that in 2012, both o <br />inspected; inside and outside. The recommendation based on the inspections is for the South <br />Water Tower to be completely rehabilitated inside and out within the next two years. This project <br />was programmed in the 2013 CIP at an estimated cost of $900,000. <br /> <br />Public Works Director Maurer <br />indicated this project required specialized engineering and <br />inspection services. For this reason, Staff requested proposals from three engineering firms. All <br />three responded to the request with proposals that reflected an understanding of the project and a <br />team capable of completing the work. He recommended the Council enter into a contract with <br />Bolton & Menk for the engineering and inspection services work for the South Water Tower. <br /> <br />MOTION: Councilmember Holden moved and Councilmember Holmes seconded a <br />motion to authorize entering into a contract with Bolton & Menk for the <br />engineering and inspection services for the South Water Tower Rehabilitation <br />Project on an hourly basis not to exceed $48,800. The motion carried (5-0). <br /> <br /> B. US 10/Highway 96 Agreements <br /> <br />Public Works Director Maurer <br />stated that MnDOT and Ramsey County are working <br />cooperatively to complete the grade separation of the intersection of US Highway 10 and <br />Highway 96. Ramsey County will be funding the entire construction cost while MnDOT has <br />completed the design and will be providing bidding and construction services. Staff anticipates <br />thth <br />that the project would be bid on February 8 with construction beginning on March 25. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.