My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-8-14-PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2010-2019
>
PC Packets 2014
>
01-8-14-PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2015 3:33:33 PM
Creation date
1/8/2014 12:18:42 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ryan Streff December 30, 2013 <br />City of Arden Hills Page 7 <br /> <br />Based on trip generation estimates shown in Table 3, the proposed development is expected to <br />generate 138 midday and p.m. peak hour trips, and approximately <br />should be noted that midday peak hour observations were collected at the Hopkins store in <br />December 2013, which indicated the midday and p.m. peak hour tri <br />similar. Therefore, for purposes of this study, the observed average trip generation was utilized for <br />the midday and p.m. peak hours. <br />Table 3.Trip Generation Estimates <br />Midday and P.M. Peak Hour Trips <br />Daily <br />Land Use Type (ITE Code) <br />Retail Store Donation Drop-Off Total <br />Trips <br />In Out In Out In Out <br />Observed <br /> Existing Maple Grove Goodwill 47 64 --- <br /> Existing Hopkins Goodwill 24 24 64 78 --- <br />Observed Average 47 67 --- <br />ITE Estimate <br />--- --- <br /> --- --- 44 44 <br /> <br /> <br />The proposed development trips were distributed throughout the study area based on the directional <br />distribution shown in Figure 4. The distribution was developed based on a combination of existing <br />travel patterns, historical AADT volumes in the area, and engineering judgment. The combination <br />of background traffic and adjacent/proposed development trips, which represents the year 2015 <br />build condition, is shown in Figure 5. <br />Year 2015 Build Intersection Operations Analysis <br />To determine if the existing roadway network can accommodate the year 2015 build traffic <br />forecasts, a detailed traffic capacity analysis was completed. T <br />analyzed using a combination of Synchro/SimTraffic and the HCM. For reporting purposes, only <br />the SimTraffic results were used. <br />Results of the year 2015 build operations analysis shown in Table 4 indicate that all study <br />intersections are expected to operate at an acceptable overall LOS C or better during the midday and <br />p.m. peak hours with the existing traffic control and geometric layout. However, the southbound <br />approach of the County Road E/Arden Plaza East Access intersection is expected to operate at <br />LOS F during the p.m. peak hour. Side-street delays of this magnitude are relatively common during <br />peak periods and generally do not warrant mitigation. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.