My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-10-14-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2014
>
02-10-14-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2014 3:08:42 PM
Creation date
2/7/2014 3:08:28 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />3.1.COUNTY ROAD E ROADWAY <br />The proposed roadway improvements to County Road E are identified below: <br />Seal coating the existing roadway surface. This will provide a regenerative treatment and will <br />· <br />allow restriping the lane configurations. <br />Lane restriping to narrow the center left turn lane width to ten feet and create five foot <br />· <br />shoulders on both sides of the roadway. Two thru-lanes would be maintained in each <br />direction. <br />Reconstructing the center medians at the Connelly Avenue and Pine Tree Drive intersections, <br />· <br />including the introduction of decorative concrete where appropriate. <br />Addition of a second eastbound left turn lane at the County Road E/Lexington Avenue <br />· <br />intersection. This will require widening of County Road E on its north side. The widened <br />roadway will taper to the existing roadway width approximately 500 west of the intersection. <br />Widening and restriping the east leg of the County Road E/Lexington Avenue intersection to <br />· <br />match the added width on the west leg necessitated by the additional left turn lane. <br />Spot replacement of concrete curb sections and driveway aprons as necessary. <br />· <br />3.2.CONNELLY STREET <br />The proposed improvements to Connelly Street are identified below: <br />Construction of concrete curb along the outside radius of the roadway curve, including <br />· <br />better delineation of driveway entrances to Pot-O-Gold and adjacent parking lots. <br />Provide centerline around the curve to define drive lanes. <br />· <br />3.3.SIDEWALKS <br />The proposed sidewalk improvements throughout the project area are identified below: <br />Widening existing sidewalk on the north side of County Road E between Connelly Street <br />· <br />intersections from 6 to 12 where proposed roadway shoulder is lost to right turn lane. <br />Lowering the sidewalk elevation at Pine Tree Drive using a 3 (approximate) retaining wall. <br />· <br />Construction of a new sidewalk along the west side of Pine Tree Drive extending <br />· <br />approximately 875 south from County Road E to the Hunters Park Condominiums driveway <br />entrance. <br />Construction of new 6 sidewalk on the north side of County Road E extending from existing <br />· <br />sidewalk east of Pine Tree Drive to Lexington Avenue. <br />Construction of ADA-compliant pedestrian ramps at all intersections and driveways. <br />· <br />Spot replacement of sidewalk panels as necessary. <br />· <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.