My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-27-14-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2014
>
10-27-14-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2016 3:51:05 PM
Creation date
10/24/2014 5:21:33 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kimley>>>Horn <br />October 9, 2014 <br />Mr. Terry Maurer, P.E. <br />Director of Public Works <br />City of Arden Hills <br />1245 West Highway 96 <br />Arden Hills, MN 55112 <br />RE: Professional Services Agreement for Final Design <br />County Road F/Lake Valentine Road Improvements <br />Dear Mr. Maurer: <br />Kimley-Horn and Associates, Inc. ("KHA" or"the Consultant") is pleased to submit this Professional <br />Services Agreement to the City of Arden Hills ("City" or"the Client") for final design services for Lake <br />Valentine Road. Our project understanding, scope of services, schedule, and estimated fee are <br />provided below. <br />Project Understanding <br />We understand that MnDOT is currently planning for the replacement of the County Road F/Lake <br />Valentine Road bridge over I-35W. As part of the preliminary planning process completed in July <br />2014, the following improvements were identified within the City of Arden Hills to provide a trail <br />connection from the proposed 1-35W bridge to Mounds View High School: <br />Construction of curb and gutter on the south side of Lake Valentine Road from the 1-35W <br />bridge to Mounds View High School. <br />s Construction of proposed storm sewer to collect stormwater runoff in the new curb and gutter. <br />s Construction of a 10 foot bituminous trail along the back of curb on the south side of Lake <br />Valentine Road. Approximately 600 feet east of the 1-35W bridge, the proposed trail <br />transitions to 8 feet wide and a 6 foot boulevard will be introduced. The limits of the proposed <br />trail are from the 1-35W bridge to Mounds View High School. <br />Construction of a retaining wall and railing along the south side of the proposed bituminous <br />trail for approximately 500 feet. <br />0 Mill and overlay of approximately 500 feet of Lake Valentine Road east of the MnDOT 1-35W <br />bridge project limits. <br />Scope of Services <br />Based on our understanding of the City's desired outcomes, KHA proposes to complete the final <br />design services specifically set forth below. <br />Task 1 — Data Collection <br />A. Topographic Survey <br />University
The URL can be used to link to this page
Your browser does not support the video tag.