Kimley>>>Horn Page 2 <br />Kimley-Horn will compile available topographic information available from MnDOT and the <br />previous survey conducted by the City of Arden Hills for the construction of a trail on the south <br />side of Lake Valentine Road. We have assumed that some additional topographic survey will be <br />required to complete the base mapping for the project. A Kimley-Horn subconsultant will obtain <br />the necessary topographic surveying for the final design work. The following is a summary of the <br />information that will be gathered through the topographic survey work: <br />Surface Features such as Signs, Light Poles, Trees, and Mailboxes <br />Profile Streets and Intersections including Edge/Center of Pavement <br />Locate Existing Property Irons and Underground Utilities (Gopher One Call) <br />Survey Utilities (Storm Drain, Sanitary Sewer and Watermain Structures) <br />Establish Survey Control and Set Project Benchmarks <br />B. Geotechnical Evaluation <br />A Kimley-Horn sub-consultant will obtain soil borings for the purpose of providing <br />recommendations for the construction of the necessary retaining wall on the south side of Lake <br />Valentine Road. We will utilize geotechnical data available from MnDOT where possible, but <br />have assumed that up to three(3) borings with a total boring depth of up to forty-five (45)feet <br />may be necessary to develop design recommendations for the retaining wall. A report will be <br />prepared outlining the findings of the investigation and providing recommendations for the project <br />improvements. <br />Task 2— Project Management/Agency Coordination <br />A. Project Management <br />Kimley-Horn will provide overall project management and utilize internal project management <br />tools to monitor budgets, staff roles, and responsibilities of all team members throughout the <br />project. We will communicate directly with the City's project manager on a regular basis to <br />discuss design decisions and progress throughout the project. We will manage day-to-day <br />activities and milestones within the project. KHA will prepare monthly billing invoices and provide <br />a summary of the work tasks required and completed at the end of each month. <br />B. Agency Coordination <br />Kimley-Horn will coordinate the final design of the proposed improvements with the MnDOT <br />bridge replacement project. We have assumed this task will include up to two (2) meetings with <br />MnDOT and general coordination with the MnDOT County Road F bridge replacement project <br />team. We have assumed this will include transferring of electronic files at critical design stages to <br />address any discrepancies between the two projects. <br />Task 3 — Final Construction Plans and Specifications <br />A. Preparation of Final Construction Documents <br />We will prepare final construction plans that include plan and profile information for the roadway, <br />trail, retaining wall, and storm sewer improvements. We have assumed that the plans will be <br />included with the City of New Brighton County Road F/10th Street project for bidding purposes. <br />iTi ifi2550 University Avenue -