My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-27-15-WS
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
2010-2019
>
2015
>
04-27-15-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2015 12:18:09 PM
Creation date
4/23/2015 12:37:52 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS SPECIAL CITY COUNCIL WORK SESSION-APRIL 27, 2015 2 <br /> 5. Allow the location of subdistricts in the Hill and Creek Neighborhoods to be moved <br /> provided that it occurs at the time of plat application for the entire neighborhood and <br /> provided that the proportional size of subdistricts do not change. <br /> Community Development Director Hutmacher explained that the meeting objectives were as <br /> follows: <br /> 1. Confirm City Council consensus direction on the results of the April 20, 2015, City <br /> Council work session meeting. <br /> 2. Establish an approval schedule. <br /> Community Development Director Hutmacher reported that staff provided a graphic that <br /> compares the draft and revised land use plans with estimates of actual built unit yield. In most <br /> cases, it is difficult to achieve maximum allowable units in an actual development plan due to <br /> irregularly shaped parcels and the needs of roads, parks, and storm water infrastructure. The <br /> revised land use plan chart reflects the City Council direction previously discussed. <br /> Lot Sizes in the NB-1 Subdistrict - Michael Lamb, Kimley-Horn, provided information on lot <br /> sizes in the NB-1 Subdistrict. A gross density of 2.75 units per acre would allow lot sizes of 90 <br /> feet by 151 feet, or 85 feet by 161 feet. <br /> Limit of 450 Multi-Family Units - The City Council has heard from multi-family and senior <br /> residential developers that those housing products are typically built at a density of approximately <br /> 40 units per acre. If multi-family units are limited to no more than 450, the acreage for multi- <br /> family development should be reduced from 17 to 11.25 acres. <br /> Adjustments to Town Center - Fit Test Option#2 adjusted the layout of the Town Center to allow <br /> a larger green space along the pedestrian corridor and a larger retail area to allow for parking <br /> required by a commercial mixed-use building. The Council supported this layout which removes <br /> 4.9 acres of residential development area. Of the remaining 49.6 acres for residential <br /> development, staff proposes to allocate 11.25 acres for multi-family and 38.35 acres for <br /> Neighborhood Transition. <br /> Draft Approval Schedule - In order for private development to begin in 2017, the Spine Road, the <br /> County Road H interchange, and trunk utilities need to be constructed in 2016. In order for that to <br /> happen, final design work needs to begin by early summer. The City should not proceed to final <br /> design of utilities without some sort of assessment agreement with Ramsey County, and Ramsey <br /> County is not able to enter into an assessment agreement without an estimate of revenue from land <br /> sales and fees. Much of the work that remains to be done rests on the completion of the TCAAP <br /> Redevelopment Code (TRC). <br /> Community Development Director Hutmacher stated that the following draft approval <br /> schedule allows infrastructure design and construction to continue as planned. <br /> Council provides direction on changes to TRC Work Session, May 11 <br /> Preliminary Approval of TRC Regular Meeting, May 26 <br /> Discussion of Comp Plan Amendment Work Sessions, June 8 & 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.